English
5 EN
5. Installation Check-up
WATER CONNECTIONS
•
No leaks from the connections or tubes
FUNCTIONING
•
Boiler and operating pressures are normal.
•
The pressure gauge is working properly.
•
The self-leveling device is working properly.
•
The expansion valves are working properly
GROUPS
•
Hook up the
¿
lter holders to the groups (without coffee).
•
Let each group dispense water for about a minute.
HOT WATER
•
Continuously dispense hot water (pressing the appropriate button) until at least 1 liter of water have been used
(see the “Hot water dispensing” chapter in the User’s Manual).
STEAM
•
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
WARNING
: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERL
<
(see
the Installation Module C).
WARNING
: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READ
<
FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
02_M21JuniorS1.indd 5
15/11/2017 17:03:07