4. INSTALLATION
4-1 UNPACKING AND CONFIRMATION OF CONTENTS
Unpack the unit to find following components in it:
●
LABOKEY 802 ……………………… 1 Unit
●
Accumu-Unit ………………………… 1 Unit
●
Instruction Manual …………………… 1 Booklet
4-2 LOCATION AND ENVIRONMENT
Explanations refers to about location and environment which the equipment is installed.
●
Use the unit indoors at room temperature 5 ‒ 30 degrees centigrade and relative
humidity 30 ‒75%.
●
Location must be free from vibration.
●
Set the unit at level.
●
Avoid rapid of change of room temperature. Otherwise condensation of water vapor may
arise, causing malfunction of electric circuitry.
4-3
INSTALLATION GUIDE
4-3-1 Confirmation of Components.
Check the components as shown
per picture on the right.
Base Plate
Accumu-Section Screws(4 pieces)
4-3-2 Assembly.
Referring to the picture on the right,
fix the hinges to the Base Plate and
Accumu-Section with4 pieces screws.
Accumu-Section Hinges
7