Not applicable, no special fixtures, devices or connections are required. General equipment used must be capable of lifting
the weight of this machine.
16
LMFC250 FINE CRUSHER MANUAL
3.3.2
Special Devices for Transportation
3.3.3
Upon Delivery
Prior to unpacking, make a visual inspection of the packaging for transit damage.
If any damage is evident, advise the transport company at the time of delivery or take photos and notes to forward to your
supplier or LAARMANN in case more serious damage is detected once the machine is unpacked.
3.3.5
Movement after Unpacking
Move the machine to the area of installation with suitable lifting equipment with a rated capacity to lift the machine.
3.2.6
Checklist of Supplied Parts
The following list describes the separate items and quantities that are/may be supplied with the LMFC 250 Crusher.
3.3.4
Unpacking the machine
Follow the procedure below to unpack the LMFC 250 Crusher. Care should be taken not to break the crate in case it may be
required for re
-
use.
•
Ensure a visual inspection upon delivery and take note of any damage that may have taken place.
•
Remove the screws that hold the front of the packing crate in place, release the front of the crate and set aside out of the
way.
•
Remove the top, sides and rear panels of the packing crate.
•
Carefully remove the plastic protective wrapping and discard.
•
Carefully cut the strapping used to secure the Crusher to the crate base and discard.
•
Using a forklift and the lifting eyes provided, carefully lift the Crusher off the crate base.
Description
Quantity
Installation, Operation, Maintenance and Spare Parts Manual
1
Gap Adjustment Spanner
1
For any parts required, that do not have an Item Number showing, please contact LAARMANN.
3.2.7
Details for Notification
If any items listed above are not included in the packaging please report the,
•
Model number
•
Description of equipment purchased
•
Date purchased
•
Where the equipment was dispatched from and
•
A list of the missing items to your supplier, or LAARMANN Group B.V.