5
The following steps outline the procedure for correct wet commissioning of the Crusher.
•
Perform a visual check on the machine to ensure there are no damaged or broken parts.
•
Start the Crusher.
•
Ensure the machine is running normally.
•
Open the hopper lid and add a quantity of sample material.
LMFC250 FINE CRUSHER MANUAL
5.6
Wet Commissioning, Starting and Stopping
5.6.1
Verification
The various procedures that follow provide information on checking and starting the LMFC 250 Crusher, as well as adjusting
& stopping the machine.
Prior to starting the machine, perform the following checks and verifications:
•
Check the Lubrication Schedule to determine if lubrication is required. If required, perform the relevant lubrication pro-
cedure â€
“
as outlined in the Lubrication Section of this Manual.
•
Carefully check for any loose, worn, missing or broken parts on the machine.
•
Check the electrical cables for any damage. Do not use the machine if any electrical cable is damaged. Notify the rele-
vant authority to have the machine tagged and the damage repaired.
Note
: Machinery Damage/Hazard –
The Crusher must be running before adding sample material. Failure to
adhere to this requirement will cause damage to the machine and void the warranty.
•
Add more material as required.
•
When all the material has been crushed, stop the Crusher and remove the sample collection tray.
•
Inspect the resultant material for the desired particle size.
Note
: It is advisable to wear the appropriate PPE during the operation of the Crusher, as noted at the beginning of this
Section of the manual
SAFETY NOTE: ISOLATE THE MACHINE BEFORE MAKING ANY ADJUSTMENTS. FAILURE TO DO
THIS MAY CAUSE SERIOUS INJURY TO THE OPERATOR OR DAMAGE TO THE MACHINE
5.6.2
Start Procedure
Isolation and startup of this machine are as per the user
’
s company procedures and control systems supplied by others.
Warning
Isolate power before accessing any electrical or mechanical components.
5.6.3
Daily Operation
Prior to operating the LMFC 250 Crusher, ensure the verification procedure above has been performed. Checklists for the operation of
this machine are as per the userâ€
™
s company requirements. While operating the Crusher, perform a general visual check to ensure
there are no damaged or broken parts.
Check that all panels are secured and the dust extraction system is correctly attached
5.6.4
Instrumentation Checks.
Not applicable.