3 TRANSPORTATION & HANDLING
14
3.1 General Safety Rules
14
3.2 Storage, Transportation and Handling
14
3.2.1 Storage
14
3.2.2 Transportation
14
3.2.3 Handling
14
3.3 Unpacking
15
3.3.1 Packaging Details
15
3.3.2 Special Devices for Transportation
16
3.3.3 Upon Delivery
16
3.3.4 Unpacking the machine
16
3.3.5 Movement after Unpacking
16
3.3.6 Checklist of Supplied Parts
16
3.3.7 Details for Notification
16
4 INSTALLATION
17
4.1 General Safety Rules
17
4.1.1 Vents and Drains
18
4.1.2 Decibel Rating
18
4.1.3 PPE Required
18
4.2 Site Services Required
18
4.2.1 Power
18
4.2.2 Pneumatics
18
4.2.3 Hydraulics
18
4.2.4 Water
18
4.2.5 Footings or Bench/Table/Frame/Platform detail
18
4.2.6 Floor Space
18
4.2.7 Drainage
18
4.2.8 Dust Extraction
18
4.2.9 Environmental Conditions
18
4.2.10 Heating, Cooling or Ventilation
18
4.3 Installation of Equipment
19
4.3.1 Special Tools
19
4.3.2 Installation Procedure
19
4.3.3 Assembly Instructions
19
4.4 Dry Commissioning
19
4.4.1 Pre
-
Operation
19
4.4.2 Operation of the Crusher
19
4.4.3 Testing the Crusher
20
4.5 Maintenance Required during Dry Commissioning
20
LMFC250 FINE CRUSHER MANUAL