English
6 EN
WATER CONNECTIONS
•
No leaks from the connections or tubes
FUNCTIONING
•
Boiler and operating pressures are normal.
•
The pressure gauge is working properly.
•
The self-levelling device is working properly.
•
The expansion valves are working properly
GROUPS
•
+RRNXSWKH¿OWHUKROGHUVWRWKHJURXSVZLWKRXWFRIIHH
•
Let each group dispense water for about a minute.
HOT WATER
•
Continuously dispense hot water (pressing the appropriate button) until at least 5 liters of water have been used for
a machine with 2 groups, 8 liters for a machine with 3 groups and 10 liters for a machine with 4 groups (see the “Hot
water dispensing” Chapter in the User’s Manual).
STEAM
(also with Autosteam)
•
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
WARNING
: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C)
.
WARNING
: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
5. Installation Check-up
02M39DosatronTE_MULTI_1617.indd 6
27/04/2016 13:56:19