2LL/2LJ/2LH-1
1-3-6
Operation
panel and
support
equipment
U200 Turning all LEDs on
-
U201 Initializing the touch panel
-
U202 Setting the KMAS host monitoring system
-
-
U204 Setting the presence or absence of a key card or
Off/Coin Vender
U206 Setting the presence or absence of a coin
On/Off Config
Off
No Coin Action
Off
Price
10/10/10/10/
U207 Checking the operation panel keys
-
U208 Setting the paper size for the side deck
Letter (Inch)/A4 (Metric)
U211 Setting the presence or absence of the job sep-
Off
U221 Setting the USB host lock function
Off
Other
U223 Operation panel lock
Unlock
-
U234 Setting punch destination
Inch (Inch)/Europe Metric (Metric)
U237 Setting finisher stack quantity
0/0
U240 Checking the operation of the finisher
-
U241 Checking the operation of the switches of the
-
U243 Checking the operation of the DP motors
-
-
U245 Checking messages
-
U246 Setting the finisher
Finisher
0/0/0/0/0/0/0/0
Booklet
0/0/0/0/0/0/0/0/0
U247 Setting the paper feed device
-
-
Mode
setting
U250 Checking/clearing the maintenance cycle
-
U251 Checking/clearing the maintenance counter
-
-
U253 Switching between double and single counts
DBL(A3/Ledger)
U260 Selecting the timing for copy counting
Eject
Section
Item
No.
Content of maintenance item
Initial setting
35ppm
45ppm
55ppm
Содержание TASKalfa 3500i
Страница 4: ...This page is intentionally left blank ...
Страница 10: ...This page is intentionally left blank ...
Страница 24: ...2LL 2LJ 2LH 1 1 10 This page is intentionally left blank ...
Страница 124: ...2LL 2LJ 2LH 1 2 100 ...
Страница 304: ...2LL 2LJ 2LH 1 3 180 This page is intentionally left blank ...
Страница 397: ...2LL 2LJ 2LH 1 4 93 This page is intentionally left blank ...
Страница 508: ...2LL 2LJ 2LH 2 1 26 This page is intentionally left blank ...
Страница 515: ...2LL 2LJ 2LH 2 2 7 45 ppm model 55 ppm model only ...
Страница 623: ...1 1 INSTALLATION GUIDE INSTALLATION GUIDE FOR DOCUMENT PROCESSOR ...
Страница 658: ...INSTALLATION GUIDE FOR PAPER FEEDER ...
Страница 671: ...INSTALLATION GUIDE FOR LARGE CAPACITY FEEDER ...
Страница 686: ...INSTALLATION GUIDE FOR SIDE DECK ...
Страница 711: ...INSTALLATION GUIDE FOR 1000 SHEETS FINISHER ...
Страница 724: ...INSTALLATION GUIDE FOR 4000 SHEETS FINISHER ...
Страница 740: ...INSTALLATION GUIDE FOR FINISHER ATTACHMENT KIT ...
Страница 754: ...INSTALLATION GUIDE FOR CENTER FOLDING UNIT ...
Страница 771: ...INSTALLATION GUIDE FOR MAILBOX ...
Страница 779: ...INSTALLATION GUIDE FOR PUNCH UNIT ...
Страница 799: ...INSTALLATION GUIDE FOR INNER JOB SEPARATOR ...
Страница 800: ...1 2 3 A B ...
Страница 801: ...7 8 4 5 6 ...
Страница 802: ...11 9 10 ...
Страница 803: ...A 1 2 3 3 2 14 15 12 13 16 ...
Страница 804: ...B 19 17 18 ...
Страница 805: ...21 22 20 ...
Страница 806: ...26 27 23 24 28 25 ...
Страница 807: ...30 29 ...
Страница 808: ...INSTALLATION GUIDE FOR RIGHT JOB SEPARATOR ...
Страница 809: ...5 1 2 3 4 5 7 7 6 A B C A B ...
Страница 810: ...9 10 11 12 13 14 7 8 Ԙ ԙ Ԙ ԙ C ...
Страница 811: ...INSTALLATION GUIDE FOR FAX System ...
Страница 836: ...2011 ...
Страница 837: ...2011 ...