2LL/2LJ/2LH
1-2-1
1-2 Installation
1-2-1 Installation environment
1. Temperature: 10 to 32.5°C/50 to 90.5°F
2. Humidity: 15 to 80% RH
3. Power supply: 120 V AC, 12.0 A
220 - 240 V AC, 7.2 A
4. Power source frequency: 50 Hz ± 2%/60 Hz ± 2%
5. Installation location
Avoid direct sunlight or bright lighting. Ensure that the photoconductor will not be exposed to direct sun-
light or other strong light when removing paper jams.
Avoid locations subject to high temperature and high humidity or low temperature and low humidity; an
abrupt change in the environmental temperature; and cool or hot, direct air.
Avoid places subject to dust and vibrations.
Choose a surface capable of supporting the weight of the machine.
Place the machine on a level surface (maximum allowance inclination: 1
).
Avoid air-borne substances that may adversely affect the machine or degrade the photoconductor, such
as mercury, acidic of alkaline vapors, inorganic gasses, NOx, SOx gases and chlorine-based organic sol-
vents.
Select a well-ventilated location.
6. Allow sufficient access for proper operation and maintenance of the machine.
Machine front : 100 cm/39 3/8"
Machine rear : 10 cm/ 3 15/16"
Machine right : 35 cm/13 3/4"
Machine left : 30 cm/11 13/16"
Machine top : 40 cm/15 3/4"
Figure 1-2-1
30cm/11 13/16"
35cm/13 3/4"
Top
40cm/15 3/4"
10cm/3 15/16"
100cm/39 3/8"
Содержание TASKalfa 3500i
Страница 4: ...This page is intentionally left blank ...
Страница 10: ...This page is intentionally left blank ...
Страница 24: ...2LL 2LJ 2LH 1 1 10 This page is intentionally left blank ...
Страница 124: ...2LL 2LJ 2LH 1 2 100 ...
Страница 304: ...2LL 2LJ 2LH 1 3 180 This page is intentionally left blank ...
Страница 397: ...2LL 2LJ 2LH 1 4 93 This page is intentionally left blank ...
Страница 508: ...2LL 2LJ 2LH 2 1 26 This page is intentionally left blank ...
Страница 515: ...2LL 2LJ 2LH 2 2 7 45 ppm model 55 ppm model only ...
Страница 623: ...1 1 INSTALLATION GUIDE INSTALLATION GUIDE FOR DOCUMENT PROCESSOR ...
Страница 658: ...INSTALLATION GUIDE FOR PAPER FEEDER ...
Страница 671: ...INSTALLATION GUIDE FOR LARGE CAPACITY FEEDER ...
Страница 686: ...INSTALLATION GUIDE FOR SIDE DECK ...
Страница 711: ...INSTALLATION GUIDE FOR 1000 SHEETS FINISHER ...
Страница 724: ...INSTALLATION GUIDE FOR 4000 SHEETS FINISHER ...
Страница 740: ...INSTALLATION GUIDE FOR FINISHER ATTACHMENT KIT ...
Страница 754: ...INSTALLATION GUIDE FOR CENTER FOLDING UNIT ...
Страница 771: ...INSTALLATION GUIDE FOR MAILBOX ...
Страница 779: ...INSTALLATION GUIDE FOR PUNCH UNIT ...
Страница 799: ...INSTALLATION GUIDE FOR INNER JOB SEPARATOR ...
Страница 800: ...1 2 3 A B ...
Страница 801: ...7 8 4 5 6 ...
Страница 802: ...11 9 10 ...
Страница 803: ...A 1 2 3 3 2 14 15 12 13 16 ...
Страница 804: ...B 19 17 18 ...
Страница 805: ...21 22 20 ...
Страница 806: ...26 27 23 24 28 25 ...
Страница 807: ...30 29 ...
Страница 808: ...INSTALLATION GUIDE FOR RIGHT JOB SEPARATOR ...
Страница 809: ...5 1 2 3 4 5 7 7 6 A B C A B ...
Страница 810: ...9 10 11 12 13 14 7 8 Ԙ ԙ Ԙ ԙ C ...
Страница 811: ...INSTALLATION GUIDE FOR FAX System ...
Страница 836: ...2011 ...
Страница 837: ...2011 ...