2KJ/2KH
1-5-44
1-5-5 Developing section
(1) Detaching and refitting the developing unit
Follow the procedure below to replace the developing unit.
Procedure
1. Remove the drum unit (see page 1-5-41).
2. While lifting the developing unit a little,
remove the unit from the machine.
3. Replace the developing unit and refit all the
removed parts.
4. Perform maintenance mode U130 (initial
setting for the developing unit) (see page 1-
3-36).
5. Perform maintenance mode U157 (clearing
the developing drive time) (see page 1-3-
38).
Figure 1-5-74
Developing unit
Содержание TASKalfa 181
Страница 1: ...SERVICE MANUAL Published in October 2009 842KJ112 2KJSM062 Rev 2 TASKalfa 181 TASKalfa 221 ...
Страница 4: ...This page is intentionally left blank ...
Страница 10: ...This page is intentionally left blank ...
Страница 14: ...2KJ 2KH This page is intentionally left blank ...
Страница 114: ...2KJ 2KH 1 3 74 This page is intentionally left blank ...
Страница 152: ...2KJ 2KH 1 4 38 This page is intentionally left blank ...
Страница 234: ...2KJ 2KH 2 1 18 Figure 2 1 19 Duplex section block diagram CPWB DUP PCSW IPPSWN YC5 5 YC1 YC7 DUPFCL ICLTN YC5 8 EPWB ...
Страница 292: ...INSTALLATION GUIDE FOR PAPER FEEDER ...
Страница 306: ...INSTALLATION GUIDE FOR DUPLEX UNIT ...
Страница 315: ...INSTALLATION GUIDE FOR BUILT IN FINISHER ...
Страница 327: ...INSTALLATION GUIDE FOR JOB SEPARATOR ...
Страница 336: ...INSTALLATION GUIDE FOR FAX System R ...
Страница 351: ...INSTALLATION GUIDE FOR Scan System F B ...
Страница 354: ......
Страница 355: ......