2-56
CHAPTER 2 OUTLINE OF OPERATION
While two hole are being made, the 3-hole puncher makes a single round trip in escape di-
rection (moving up the hole puncher).
(punch shaft CCW rotation by
90˚/punch at upper limit)
(punch CCW rotation by 180˚/
punch back at initial position)
(punch shaft at rest/
home position)
F02-602-07
Содержание DF-75
Страница 1: ...SERVICE MANUAL Published in Aug 01 5FG70760 DF 75...
Страница 12: ...CHAPTER 1 GENERAL DESCRIPTION...
Страница 24: ...CHAPTER 2 OUTLINE OF OPERATION...
Страница 89: ...CHAPTER 3 MECHANICAL SYSTEMS...
Страница 108: ...3 19 CHAPTER 3 MECHANICAL SYSTEMS 3 Detach the timing belt 3 and remove the two screws 4 F03 102 26 3 4 4...
Страница 132: ...CHAPTER 4 MAINTENANCE AND INSPECTION...
Страница 135: ...CHAPTER 5 TROUBLESHOOTING...
Страница 142: ...5 7 CHAPTER 5 TROUBLESHOOTING...
Страница 145: ...5 10 CHAPTER 5 TROUBLESHOOTING 2 1 2 Motor PCBs M7 M8 M5 M4 M3 M6 M1 M2 1 F05 201 02...
Страница 175: ...5 40 CHAPTER 5 TROUBLESHOOTING...
Страница 176: ...APPENDIX...
Страница 180: ...A 4...
Страница 184: ...A 8 APPENDIX...
Страница 198: ...A 22...