. INSPECTION/ADJUSTMENT
3-24
UXV 500
TOE-IN ADJUSTMENT
Place the machine on a level place.
Measure the toe-in
Adjust if out of specification.
Toe-in measurement steps:
Mark both front tire tread centers.
Raise the front end of the machine so that
there is no weight on the front tires.
Fix the handlebar straight ahead.
Measure the width A between the marks.
Rotate the front tires 180 degrees until the
marks come exactly opposite.
Measure the width B between the marks.
Calculate the toe-in using the formula given
below.
Toe-in = B
-
A
Toe-in: 0
~
15 mm (0
~
0.6 in)
If the toe-in is incorrect, adjust the toe-in.
Adjust the toe-in step:
Mark both tie-rods ends.
This reference point will be needed during
adjustment.
Loosen the lock nuts (tie-rod end) of both
tie-rods
The same number of turns should be given
to both tie-rods right and left until the
specified toe-in is obtained, so that the
lengths of the rods will be kept the same.
Tighten the rod end lock nuts of both tie-
rods
Torque:
3.5 kgf-m (35 N-m, 25.2 lbf-ft)
•
Be sure that both tie-rod are turned the
same amount. If not, the machine will
drift tight or left even though the
handlebar is positioned straight which
may lead to mishandling and accident.
•
After setting the toe-in to specification,
run the machine slowly for some
distance with hands placed lightly on
the handlebar and check that the
handlebar responds correctly. If not,
turn either the right or left tie-rod
within the toe-in specification.
*
Tie-rod
Tie-rod End Nuts
A
B
Содержание Kymco UXV 500i
Страница 22: ......
Страница 36: ......
Страница 68: ......
Страница 70: ...4 LUBRICATION SYSTEM 4 1 UXV 500 LUBRICATION SYSTEM DIAGRAM...
Страница 86: ......
Страница 88: ...5 FUEL SYSTEM 5 1 UXV 500 Fuel Pump Fuel Filter Fuel Tank...
Страница 108: ...6 COOLING SYSTEM 6 1 UXV 500 SYSTEM FLOW PATTERN...
Страница 128: ......
Страница 142: ...8 CYLINDER HEAD VALVES 8 1 UXV 500 SCHEMATIC DRAWING...
Страница 172: ...9 CYLINDER PISTON 9 1 UXV 500 SCHEMATIC DRAWING...
Страница 182: ...10 DRIVE PULLEY DRIVEN PULLEY CLUTCH 10 1 UXV 500 SCHEMATIC DRAWING...
Страница 210: ...11 FINAL REDUCTION TRANSMISSION SYSTEM 11 1 UXV 500...
Страница 238: ......
Страница 240: ...12 LEFT CRANKCASE CRANKSHAFT BALANCE SHAFT 12 1 UXV 500...
Страница 246: ......
Страница 248: ...13 DRIVE TRAIN 13 1 UXU 500 FRONT DRIVE REAR DRIVE...
Страница 270: ...13 DRIVE TRAIN 13 23 UXU 500 SPECIAL TOOL A120F00026 5 6...
Страница 272: ......
Страница 274: ...14 FRONT WHEEL FRONT SUSPENSION STEERING SYSTEM 14 1 UXV 500...
Страница 290: ......
Страница 292: ...15 REAR WHEEL SHOCK ABSORBER SWING ARM 15 1 UXV 500...
Страница 338: ......
Страница 340: ...17 BATTERY CHARGING SYSTEM 17 1 UXV 500 CHARGING SYSTEM LAYOUT CHARGING CIRCUIT Battery Regulator Rectifier ACG...
Страница 354: ...18 IGNITION SYSTEM 18 1 UXV 500 IGNITION SYSTEM LAYOUT Fuse CDI Spark Plug Ignition Coil...
Страница 355: ...18 IGNITION SYSTEM 18 2 UXV 500 IGNITION CIRCUIT...
Страница 362: ...19 STARTER SYSTEM 19 1 UXV 500 STARTING SYSTEM LAYOUT Start Motor Battery Start Relay Start MAG...
Страница 363: ...19 STARTER SYSTEM 19 2 UXV 500 STARTING CIRCUIT...
Страница 372: ......
Страница 383: ...21 WIRING DIAGRAMS 21 0 UXV 500 21 21...
Страница 384: ...21 WIRING DIAGRAMS 21 1 UXV 500...
Страница 391: ...22 FUEL INJECTION SYSTEM 22 6 UXV 500i WTS Inductive Ignition Coil Hi Beam Relay Start Relay Battery Lo Beam Relay...
Страница 392: ...22 FUEL INJECTION SYSTEM 22 7 UXV500i Fuel Pump Relay Switch Power Relay Roll Sensor Winker Relay REG REC Hazard Control...
Страница 421: ...22 FUELINJECTION SYSTEM 22 36 UXV 500i J Press the Enter button and then turn to the first page...