- 13 -
**Above operations, you could press
button to save the setting and
quick-exit the program. **
(8) How to check the parameters?
Press
button ,then press
to check the parameter of B - C - D - E-
F- G - H .
Code Parameter
Range
B
Water in temperature
-9 to 99
℃
C
Water out Temperature
-9 to 99
℃
D
Heating pipe temperature
-29 to 99
℃
E
Gas return temperature
-29 to 99
℃
F
Ambient temperature
-29 to 99
℃
G
Cooling pipe temperature
-9 to 99
℃
H
Actual steps of Electronic expansion valve
N*5
** ATTENTION **
When you press
and press
button to enter into parameter
checking , the
button could not be operated.
At the same as above ,when you press
and press
button to check
TIME - starting time of TIMER and Stopping time of TIMER ,the
could
be not operated.
5. Parameter setting
This part should be operated only by qualified technicians for
after-service or maintenance.
Содержание Green Energy ECO 10
Страница 2: ......
Страница 22: ...20 8 Electrical Wiring ECO 3 5 8 10 wiring diagram...
Страница 23: ...21 ECO 12 wiring diagram...
Страница 24: ...22 9 Figures of the pump 9 1 Exploded Diagram...
Страница 26: ...24 10 Accessories Anti vibration base 4 pcs Beneath the machine stand Draining jet 2 pcs Under the bottom panel...
Страница 27: ...25 11 Warranty and Returns 11 1 Warranty...
Страница 49: ...47 8 Verkabelung ECO 3 5 8 10...
Страница 50: ...48 ECO 12...
Страница 51: ...49 9 Fakten zur Pumpe 9 1 Explodierte Zeichnung...
Страница 57: ......
Страница 58: ...A0111KWDE01...