![Kubota KJ-S130VX Скачать руководство пользователя страница 33](http://html.mh-extra.com/html/kubota/kj-s130vx/kj-s130vx_operators-manual_2008759033.webp)
17
OPERATING THE ENGINE
ENGLISH
WARMING UP
Be sure to warm up the engine, not only in winter, but
also in warmer seasons. An insufficiently warmed-up
engine can shorten its service life.
Warm-up in the Low Temperature Range
In cold weather, the engine oil may be cold with
increased viscosity. This can delay oil circulation or
abnormally low oil pressure for some time after
engine start-up. This can result trouble in the
lubrication circuit or damage to the engine moving
parts.
To prevent the above problems, perform the
following instructions:
Warm up the engine at rated revolution with no load.
Ambient temperature
Warm-up time requirement
Above 0ºC (32ºF)
At least 10 minutes
0ºC (32ºF) to –10ºC (14ºF)
10 to 20 minutes
Below –10ºC (14ºF)
More than 20 minutes
PREPARATION TO SUPPLY THE ELECTRIC
POWER
Connection Notes
3
WARNING:
To avoid personal injury:
¡
Before the generator can be
connected to a building’s electrical
system, a licensed electrician must
install an isolation (transfer) switch
in the building’s main fuse box. The
switch is the connection point for
generator power and allows
selection of generator or main line
power to the building. This will
prevent the generator from
charging the main power line
(backfeeding) when the main
power supply has failed or has
been turned off for line repair.
Backfeeding can electrocute or
injure line maintenance personnel.
Also, generator and building
electrical system damage can
occur when normal operating
power returns if unit is used
without an isolation switch.
1.
Avoid connecting the generator to commercial
power outlet.
2.
Avoid connecting the generator in parallel with
any other generator.
Connecting the Load (General type)
3
WARNING:
To avoid personal injury:
¡
Connect or disconnect the load
t o t h e A C r e c e p t a c l e s o r
terminals only when the engine
is stopped.
1.
Turn OFF the circuit breaker on the control panel.
(1) Circuit breaker
(1) Circuit breaker
2.
Connect the load to the A.C. output terminals.
Содержание KJ-S130VX
Страница 1: ...G3601 8911 8 ...
Страница 55: ...39 ENGLISH TROUBLESHOOTING 쎱 When Engine must be Stopped Immediately 쎱 When Engine Overheats ...
Страница 56: ...40 ENGLISH TROUBLESHOOTING ...
Страница 57: ...41 ENGLISH WIRING DIAGRAM Engine Circuit Diagram for D1703 V2203 ...
Страница 58: ...42 ENGLISH WIRING DIAGRAM Engine Circuit Diagram for V3300 ...
Страница 61: ...45 ENGLISH WIRING DIAGRAM Generator Circuit Diagram KJ T160DX 220 127V 60Hz KJ T210VX 220 127V 60Hz ...
Страница 62: ...46 ENGLISH WIRING DIAGRAM Generator Circuit Diagram KJ T130DX 415 240V 50Hz KJ T180VX 415 240V 50Hz ...
Страница 63: ...47 ENGLISH WIRING DIAGRAM Generator Circuit Diagram KJ S130VX AUS 240V 50Hz ...
Страница 64: ...48 ENGLISH WIRING DIAGRAM Generator Circuit Diagram KJ T130DX AUS 415 240V 50Hz KJ T180VX AUS 415 240V 50Hz ...
Страница 65: ...49 ENGLISH WIRING DIAGRAM Generator Circuit Diagram KJ S240 AUS 240V 50Hz ...
Страница 66: ...50 ENGLISH WIRING DIAGRAM Generator Circuit Diagram KJ T300 AUS 415 240V 50Hz ...