Start-up
7
Preparing the tractor
7.2
Vendro 680
Original operating instructions 150001223_01_en
47
Actual value ac-
cording to calcula-
tion
Permitted value ac-
cording to operat-
ing instructions for
the tractor
Double permitted
tyre load capacity
(two tyres)
Minimum ballasting
Front/rear
kg
Total weight
kg
<
kg
Front axle load
kg
<
kg
<
kg
Rear axle load
kg
<
kg
<
kg
7.2
Preparing the tractor
NOTICE
Damage to the machine caused by a collision with the tow coupling
Depending on the type of tractor, the top link of the tractor and/or the universal shaft of the
machine may collide with the tow coupling and damage the tractor and/or the machine.
If necessary, remove the tow coupling. For additional information, please refer to the
tractor manufacturer's operating instructions.
KS000-021
The machine is equipped with Cat. II centring pivots for the three-point linkage.
The tractor lower links must always be installed so that the lifting points of the lower links are
all at the same distance from the ground.
Fix the lower links using retaining chains or retaining rods to prevent the machine swinging
to the side during transport or turning.
7.3
Connecting machine to tractor
NOTICE
When attaching implements at the front and rear, the permitted total weight, the permitted
axle loads and the tyre load capacity of the tractor must not be exceeded. Even with an
implement mounted at the rear, the front axle of the tractor must always be loaded with at
least 20% of the tare weight of the tractor.
Prior to starting the trip, ensure that these conditions are met,