Special equipment
109
Pos : 31.27 / BA/Sonderauss tatung/Eas yC ut / AM M ähwer ke/Q uerför der er/Ei nst ellung Trans por tband @ 10\ mod_1222333861895_78. doc @ 140480
14.8
Setting Conveyor Belt
The conveyor belt must be tensioned to an expansion of approx. 0.6%.
4
EC-202-0
3
Figure. 66
To do this:
•
Loosen the bearing bolts (4) on the right-hand and left-hand sides of the conveyor belt.
•
Use the adjustment screws (3) on the right-hand and left-hand sides to relieve the
conveyor belt.
•
Mark the conveyor belt at a distance of a = 1000 mm.
•
Use the adjustment screws (3) to tighten the conveyor belt until the marks have a
dimension of
a = 1006 mm
.
•
Tighten the bearing bolts (4) on the right and left (see in Maintenance chapter "Tightening
Torques").
Pos : 31.28 / BA/Sonderauss tatung/Eas yC ut / AM M ähwer ke/Q uerför der er/Leist e am Querf öderband ver bog en @ 44\ mod_1275989250656_78. doc @ 394468
14.9
Bar on cross conveyor is bent
1
a
1
2
Fig. 67
If a cross conveyor bar (1) is bent in the outside area by contact with foreign object, the bent
area (a) must be cut off close to the nearest rivet (2).
This will prevent further destruction to the bar or cross conveyor bar.
Pos : 31.29 / BA/-----Seit enumbruc h------ @ 0\ mod_1196175311226_0. doc @ 4165