VI - 3
Hydraulic system
6.2.2 Examples of emergency manual
operation
Raising the pick up
•
Screw in the star-wheel screw on the „Raise lower pick-
up“ control valve.
•
Push in the solenoid plunger of the control valve (2)
using a sharp object. The pick-up will raise.
•
Keep the solenoid plunger pressed in and screw out the
star-wheel screw again to its end stop.
Raising the rear flap
•
Screw in the two star-wheel screws on the „Raise lower
rear flap“ control valve.
•
Push in the solenoid plunger of the control valve (1)
using a sharp object. The rear flap will raise.
•
Keep the solenoid plunger pressed in and screw out
one of the two star-wheel screws again to its end stop.
•
Screw out the other star-wheel screw again to its end
stop.
After carrying our the emergency-manual operation,
the star-wheel screws must be fully screwed out again.
Содержание 4XL-RGL
Страница 4: ...Foreword ...
Страница 10: ...I 4 General information ...
Страница 15: ...II 5 Safety ...
Страница 20: ...II 10 Safety ...
Страница 38: ...III 18 Operation ...
Страница 44: ...V 4 Operator friendly solenoid control unit ...
Страница 48: ...VI 4 Hydraulic system 6 2 3 Hydraulic unit standard ...
Страница 49: ...VI 5 Hydraulic system 6 2 4 Hydraulic unit operator friendly ...
Страница 52: ...VI 8 Hydraulic system ...
Страница 68: ...VII 16 Maintenance ...
Страница 70: ...VIII 2 Overwintering ...
Страница 72: ...IX 2 Recommissioning ...
Страница 74: ...X 2 Faults causes and removal ...
Страница 83: ...A 9 Appendix A2 Electrical circuit diagram Standardoperation ...
Страница 84: ...A 10 Appendix Operator friendlyoperation ...
Страница 85: ...A 11 Appendix ...
Страница 86: ...A 12 Appendix ...
Страница 87: ...A 13 Appendix ...