Kroll BKM120 Скачать руководство пользователя страница 5

3

General

P

1

P

2

TI

C

S

1

TI

C

S

2

TI

C

S

3

X

2

M

X

1

M

P

3

K

ro

ll

G

m

bH

-P

fa

rr

ga

rte

ns

tra

ße

46

,D

-7

17

37

K

irc

hb

er

g

P

&

Id

ia

gr

am

A

us

g.

D

at

um

G

ez

ei

ch

n.

G

ep

ft

B

K

M

12

0

A

03

.0

4.

14

S

ch

m

id

he

at

co

ns

um

er

pl

at

e

he

at

ex

ch

an

ge

r

oi

lb

ur

ne

r

B

K

10

0

bo

ile

r

ne

ut

ra

lis

at

io

n

bo

x

el

ec

tri

c

ai

r

pr

eh

ea

te

r

ne

ut

ra

liz

ed

co

nd

en

sa

te

flu

e

ga

s

ai

r

oi

l

S

1

ex

pa

ns

io

n

ta

nk

B

1

B

2

B

3

P

I

S

6

B

4

B

5

V

3

V

1

V

2

P1

Kes

sel

kr

ei

spum

pe

Boi

ler

 c

irc

ul

at

ion p

um

p

P2

Zubr

inger

pum

pe

Pr

im

ar

y f

low

 p

um

p

P3

Kondens

at

pum

pe

Condens

at

e p

um

p

V1

Br

enner

gebl

äs

e

Bur

ner

 fan

V2

A

bgas

gebl

äs

e

Fl

ue g

as

 fan

V3

G

ranul

at

bel

üf

tu

ng

A

ir s

par

gi

ng f

or

 g

ranul

at

e

X1

Int

er

ner

 M

is

cher

Int

er

nal

 m

ix

er

X2

HK

1 M

is

cher

HC1

 m

ix

er

A

pp

ar

at

e / A

pp

ar

at

us

V

1

V

2

B1

A

bs

per

rhahn

Shut

-of

f c

oc

k

B2

A

bs

per

rhahn

Shut

-of

f c

oc

k

B3

A

bs

per

rhahn

Shut

-of

f c

oc

k

B4

Kes

sel

fül

l- und ent

leer

hahn

Fi

lling and di

sc

har

gi

ng c

oc

k

B5

Kappenv

ent

il

Cap v

al

ve

B6

Hahn f

ür

 B

el

üf

tung

V

al

ve f

or

 aer

at

ion

B7

Ent

leer

hahn S

ek

undär

sei

te

Di

sc

har

gi

ng c

oc

k s

ec

ondar

y

V1

Ent

lüf

ter

 P

rim

är

sei

te

V

ent

 v

al

ve pr

im

ar

y s

ide

V2

Ent

lüf

ter

 S

ek

undär

sei

te

V

ent

 v

al

ve s

ec

ondar

y s

ide

V3

Ent

lüf

ter

 W

är

m

eüber

trager

V

ent

 v

al

ve heat

 ex

changer

V4

Sper

rv

ent

il

Bl

oc

king v

al

ve

S1

Über

dr

uc

kv

ent

il

Saf

et

y v

al

ve

A

rm

at

ur

en

 / V

al

ve

s

S1

-T

IC

Kes

sel

rüc

klauf

fühl

er

Boi

ler

 ret

ur

n f

low

 tem

per

at

ur

e s

ens

or

S2

-T

IC

Kes

sel

vor

lauf

fühl

er

Boi

ler

 tem

per

at

ur

e s

ens

or

S3

-T

IC

V

or

lauf

fühl

er

 der

 S

ek

undär

sei

te

Fl

ow

 tem

per

at

ur

e s

ens

or

 s

ec

ondar

y s

ide

S4

-T

IC

A

bgas

tem

per

at

ur

fühl

er

Fl

ue gas

 tem

per

at

ur

e s

ens

or

S5

-T

IC

A

ent

em

per

at

ur

fühl

er

A

m

bi

ent

 tem

per

at

ur

e s

ens

or

S6

-PI

Kes

sel

m

anom

et

er

Boi

ler

 pr

es

sur

e gauge

Fühl

er

 / S

ens

or

s

V

3

V

4

el

TI

C

S

4

B

6

B

7

TI

C

S

5

el

12

N

48

89

N

50

14

N

49

10

11

N

5N

51

44

1.3  Pipework scheme

Содержание BKM120

Страница 1: ...Operation Manual BKM120 Mobile hot water unit 053373 00c July 2014 0085 ...

Страница 2: ......

Страница 3: ...ical connection 8 4 3 Commissioning 8 4 3 1 Commissioning at outdoor temperatures 5 C 9 4 3 2 Commissioning at outdoor temperatures 5 C 9 4 3 3 Secondary side 9 5 Decommissioning 10 5 1 Boiler shutdown 10 5 2 Disassembling the unit 10 6 Control settings 11 6 1 Normal heating mode 11 6 2 Manual heating mode 11 6 3 Standby mode 11 6 4 Boiler temperature 11 7 Maintenance and servicing 12 7 1 Cleaning...

Страница 4: ...on of the heating circuit is a plate heat exchanger In the following the circuit of the heat transfer medium between boiler and heat transformer will be called primary circuit or primary side The circuit which is connected externally and flowing through the heat transformer at the opposite side will be called secondary circuit or secondary side Note The burner is supplied with oil oil connection a...

Страница 5: ...ck B3 Absperrhahn Shut off cock B4 Kesselfüll und entleerhahn Filling and discharging cock B5 Kappenventil Cap valve B6 Hahn für Belüftung Valve for aeration B7 Entleerhahn Sekundärseite Discharging cock secondary V1 Entlüfter Primärseite Vent valve primary side V2 Entlüfter Sekundärseite Vent valve secondary side V3 Entlüfter Wärmeübertrager Vent valve heat exchanger V4 Sperrventil Blocking valve...

Страница 6: ...h Max pressure primary circuit 300 kPa Max pressure secondary circuit 800 kPa Pressure drop secondary side 16 kPa Max outlet temperature 80 C Connections Secondary flow and return 2 BSP internal thread Oil pipe Quick coupling female Filling discharging primary circuit 1 2 hose connection Discharge heat exchanger 1 2 internal thread Electric connection Voltage 230 V Amperage 16 A Plug blue IEC60309...

Страница 7: ...5 General 1 5 Circuit diagram ...

Страница 8: ...KM120 must only be operated when it is in a technically proper condition Faults or damages that could or do alloy the safety must be repaired immediately and professionally Damaged elements and unit components must only be replaced by original Kroll spare parts Always observe the regulations warnings of the local safety regulations during loading transport to or from site as well as during storage...

Страница 9: ...front side rear side onto rear side Warning When the units are stacked never do any maintenance cleaning or other work neither at the upper unit nor at the lower unit Warning 3 Transport and storage 3 1 Transport Before transport make sure that all connections have been removed This means the electrical connections the oil feeding line and the secondary connection water connection the chimney has ...

Страница 10: ...ry circuit there is a pressure of minimum 1 5bar if the pressure is lower you have to add heat transfer liquid see chapter Maintenance and servicing 4 Installation and commissio ning Fig 1 Control panel BKM120 Main switch BKM120 Light Main switch boiler Boiler control Changeover switch Preheat Boileroperation Heating of neutralization box and siphon Signal lamp bur ner malfunction Resetbutton for ...

Страница 11: ...ng controlling time the secondary circuit is filled and deaerated the cap valve B5 at the expansion vessel is opened the condensate pipe and the neutralisation box are filled with water and free of ice the valves B1 B2 and B3 are opened all connections and screwings are sealed the inlet air hose is put onto the burner At temperatures near or below the freezing point you have to check if the siphon...

Страница 12: ...eating oil from the oil pipes and the oil filter and deaerated device To shutdown the boiler proceed as follows Push the ESC button several times until the ESC text expires Use the rotary knob to set Select function and confirm Select Boiler and confirm Push the left central quick select button twice Set the operation mode to Off and confirm with Save Wait for at least 5min only then switch the bo...

Страница 13: ...rol may occur pulsing control long controlling time Setting Push the ESC button several times until the ESC text expires Use the rotary knob to set Settings MB and confirm Select Enter password and confirm Enter the password 234 and confirm 6 Control settings Generally consider the operating manual of the master control Note Mostly settings are only done at the secondary side These settings are in...

Страница 14: ...e the siphon and wash it out with water Then wash the synthetic heat exchanger from the front see burner manual chapter 7 4 Wet cleaning neutralization box and plastic heat exchanger The water leaves at the back via the drain channel of the BKM120 In order to clean the granulate fill it into a sepa rate basin first There wash it with clear water decant the water and refill the cleaned granulate ba...

Страница 15: ... which can be discharged via the primary drain bolt For ventilation open the ball valve B6 Ideally the discharged heat trans fer liquid should be collected The heat trasferring liquid Glykosol N is classi fied with water hazard class 1 as slightly water endangering Note Now you can unscrew the four bolts two at the primary side and two at the secondary side and loosen the cover plate of the heat e...

Страница 16: ...BKM120 14 EC conformity certification 8 EC conformity certification EG Konformitätserklärung Déclaration de conformité CE ...

Страница 17: ...15 Notes 9 Notes Notes and particularities ...

Страница 18: ...BKM120 16 Notes Notes and particularities ...

Страница 19: ...17 Notes Notes and particularities ...

Страница 20: ...ment design shall result in expiration of every guarantee claim Otherwise our Conditions of Sale and Delivery shall apply Subject to technical change in terms of product improvement without notice updated 2016 01 29 08 16 Kroll GmbH company Pfarrgartenstraße 46 D 71737 Kirchberg Murr Phone 0049 0 7144 830 200 Fax 0049 0 7144 830 201 E mail mail krolluk com Internet www kroll de ...

Отзывы: