- 18 -
9
9
7
0
F
0
1
.
7
0
.
8
0
K
S
0
1
.
7
0
.
8
0
C
K
e
m
a
N
-
D
t
ll
e
t
s
r
e
e
m
a
N
.
r
p
e
g
e
m
a
N
.
f
t
z
t
e
s
r
e
.
d
t
z
t
e
s
r
e
8. Çàïóñê è ýêñïëóàòàöèÿ
8.1 Ïðåäïîñûëêè äëÿ çàïóñêà ôèëüòðà
Ôèëüòð ãîòîâ ê ýêñïëóàòàöèè ïîñëå òîãî, êàê:
•
áûë ïðîèçâåäåí îñìîòð ñåðèéíîãî íîìåðà óñòðîéñòâà
äëÿ îïðåäåëåíèÿ ðàáî÷åãî äàâëåíèÿ.
•
ôèëüòð áûë óñòàíîâëåí â ñîîòâåòñòâèè ñ èíñòðóêöèÿìè,
ñîäåðæàùèìèñÿ â ðàçäåëå 7. „Ìîíòàæ“.
•
áûëè ïðàâèëüíî ïîäñîåäèíåíû âñå âõîäíûå è âûõîäíûå
ëèíèè.
•
èìåþòñÿ â íàëè÷èè íåîáõîäèìûå âèäû ýíåðãèè (ñæàòûé
âîçäóõ).
•
çàêðûòû îòñå÷íûå óñòðîéñòâà (íàïðèìåð, øàðîâûå
êëàïàíû) âî âõîäíûõ è âûõîäíûõ ëèíèÿõ ñæàòîãî âîçäóõà.
•
Êîíäåíñàò áåñïðåïÿòñòâåííî ñòåêàåò ÷åðåç
êîíäåíñàòîîòâîä÷èê.
•
ýëåêòðîííûé êîíäåíñàòîîòâîä÷èê ïîäêëþ÷åí ê
ýëåêòðîñåòè ñ ïðàâèëüíûì ðàáî÷èì íàïðÿæåíèåì (òîëüêî
ýëåêòðîííûå êîíäåíñàòîîòâîä÷èêè).
•
ôèëüòðû îñíàùåíû ñîîòâåòñòâóþùèìè ñìåííûìè
ýëåìåíòàìè.
8.2 Çàïóñê è ýêñïëóàòàöèÿ
Ôèëüòð ìîæíî âêëþ÷àòü òîëüêî ïîñëå âûïîëíåíèÿ
âñåõ ïðåäâàðèòåëüíûõ óñëîâèé, óêàçàííûõ â ðàçäåëå
8.1.
„Ïðåäïîñûëêè äëÿ çàïóñêà ôèëüòðà“.
Ïîñòåïåííî ïîäàâàéòå äàâëåíèå íà ôèëüòð, ìåäëåííî
îòêðûâàÿ âõîä/âûõîä ñæàòîãî âîçäóõà.
Çàêðîéòå îòñå÷íûå óñòðîéñòâà â áàéïàñå (ïðè èõ
íàëè÷èè).
Òåïåðü ôèëüòð ÃÎÒÎÂ Ê ÐÀÁÎÒÅ.
8. Start-up, operation
8.1 Preconditions for starting the filter
The filter/ -system is ready for starting when:
•
Check unit serial number tag to verify working pressure.
•
They has been installed in accordance with section 7.
„Mounting“.
•
All inlet and outlet lines have been correctly connected.
•
The required forms of energy are available.
•
The shut-off devices (e.g. ball valve) in the compressed-air
inlet and outlet lines are closed.
•
The condensate is able to flow through the condensate
drain without obstruction.
•
The electronical condensate drain has been connected to
the electric power supply system with the correct operating
voltage (only electronical condensate drains).
•
The filter/ -system is equipped with the right cartridges.
8.2 Start up, operation
Before starting the filter, ensure that all the
requirements specified in section 8.1 „Precondi- tions
for starting the filter“ have been fulfilled.
Place filter/ -system under pressure gradually by
slowly opening the compressed air inlet/outlet.
Close the shut-off device in the bypass (if installed).
The filter/ -system is now OPERATIVE.