background image

Control Board Removal and Installation

SECTION 8

  FIREPLACE SETUP

#SP-41-L

R.6  February 2022

35

HUSSONG MFG. CO., INC.

KOZY HEAT FIREPLACES

8.3  Control Board Removal and Installation

WARNING: If burner and/or pilot have been burning, 

use appropriate protection to avoid burns or damage 

to personal property before removing any components. 

 

DO NOT OPERATE THIS APPLIANCE WITHOUT THE SEALING GASKET 

(LOCATED UNDER THE CONTROL BOARD) IN PLACE. IF GASKETING IS 

DAMAGED, IT MUST BE REPLACED.
CAUTION: Check all connections for leaks with soapy water, whether 

field or factory made. 

8.3.1  Control Board Removal

1.  Disconnect electrical power. 
2.  Locate the manual valve installed by your qualified service 

technician. Turn the manual valve clockwise to the OFF position.

3.  Open the control compartment access panel.
4.  Remove log set, lava rock, and panels (if installed).
5.  Remove the burner tube by sliding it to the left off of the 

burner orifice. 

6.  Remove and save (4) screws securing the back log/

burner bracket. 

7.  Remove and save (4) screws securing the left and right front 

log plates.

8.  Remove and save (5) screws securing the heat shield.
9.  Remove and save (10) screws securing control board to 

firebox floor.  

10.  Lift the control board out of the firebox, being careful not to 

damage the sealing gasket underneath. 

8.3.2  Control Board Installation

1.  Place control board in the firebox, aligning the holes in the 

control board with the holes in the firebox bottom. 

VERIFY SEALING GASKET IS IN PLACE.

2.  Secure the control board with screws previously removed.
3.  Reinstall the heat shield using (5) screws previously removed. 
4.  Reinstall the front log plates. There is ‘L’ etched into the left 

log plate and ‘R’ etched into the right plate. Position the 

plates correctly into the firebox and secure with (4) screws 

previously removed.

5.  Reinstall back log/burner bracket (4) screws previously removed.
6.  Reinstall the burner tube by sliding it to the right and positioning 

the burner tube venturi over the burner orifice. 

7.  Reinstall log set, lava rock, and panels (if installed).
8.  Reinstall the glass frame assembly and safety barrier. 
9.  Set control compartment access cover panel back into position.
10.  Turn the manual valve counterclockwise to the ON position. 
11.  Reconnect electrical power. 
12.  Verify proper log placement, operation of fireplace, and any 

electrical components. 

Remove the burner tube

Remove the back log/burner bracket, and front (2) log plates

Remove heat shield

Remove control board

Back Log/Burner Bracket

Front Log Plates

L

R

FIGURE 8.3 

Control Board Removal and Installation

Содержание SP-41-L

Страница 1: ...t permanently located manufactured home USA only or mobile home where not prohibited by local codes This appliance is only for use with the type of gas indicated on the rating plate This appliance is...

Страница 2: ......

Страница 3: ...fety We offer our continual support and guidance to help you achieve the maximum benefit and enjoyment from your Kozy Heat gas fireplace Jim Hussong President Dudley Hussong Board Chairman Homeowner R...

Страница 4: ......

Страница 5: ...uirements 25 7 3 Restrictor Assembly and Installation 26 7 4 Vent Installation 27 7 5 Class A Chimney Masonry Chimney Conversion 30 7 6 Coaxial to Co Linear Chimney Conversion 31 7 7 700 2 Series Dire...

Страница 6: ......

Страница 7: ...ring said thirty 30 day period a battery operated carbon monoxide detector with an alarm shall be installed 1 3 2 Approved Carbon Monoxide Detectors Each carbon monoxide detector as required in accord...

Страница 8: ...tallation Code local authorities or codes having jurisdiction in your area regarding derate guidelines 2 1 1 1 US Installations Refer to the American Gas Association guidelines for the gas designed ap...

Страница 9: ...2022 9 HUSSONG MFG CO INC KOZY HEAT FIREPLACES 2 3 Appliance Dimensions 5 133mm 153 8 390mm 93 8 237mm 241 8 611mm 37 940mm 343 8 874mm 40 1035mm 34 878mm 15 380mm LEFT SIDE TOP VIEW FRONT VIEW RIGHT...

Страница 10: ...ls If the barrier becomes damaged the barrier shall be replaced with Hussong Mfg s barriers for this appliance IMPORTANT Consider the height of hearth finish material when building a fireplace platfor...

Страница 11: ...ge 35 for access to the control board before and after installation 3 1 1 Appliance Placement Considerations WARNING Due to high temperatures the appliance should be located out of traffic and away fr...

Страница 12: ...trock The clearance to header must be maintained Top stand off brackets must be formed and attached prior to positioning fireplace into framed opening 1 Remove and save 4 screws securing the stand off...

Страница 13: ...d 1 Locate the nailing tabs on the right and left sides of the fireplace necessary to accommodate the thickness of your facing material 2 Bend out the 4 nailing tabs until parallel with fireplace face...

Страница 14: ...653mm A 45 projection from appliance sides 0 0mm Appliance sides to adjacent sidewall 4 1 2 114mm Fireplace enclosure floor to 3 4 19mm trim 37 1 8 943mm Mantel 6 152mm deep from fireplace enclosure f...

Страница 15: ...ing the full width and depth of the appliance This fireplace may be elevated off the floor provided it is properly supported by framing materials and maintains ceiling clearances If installed above fl...

Страница 16: ...ucts listed as non combustible per ASTM E 136 3 6 1 3 Horizontal Terminations IMPORTANT Horizontal vent sections require 1 4 6mm rise for every 12 305mm of travel Kozy Heat s 700 WPT or wall thimble p...

Страница 17: ...ing envelope and weatherproof membrane are not to be interrupted by fireplace installation See FIGURE 3 7 on the following page Fireplace operation is approved from 40 F to 110 F All wiring connection...

Страница 18: ...by fireplace installation Minimum weatherproof overhang in front and sides M i n i m u m w e a t h e r p r o o f o v e r h a n g i n f r o n t a n d s i d e s Minimum weatherproof overhang in front an...

Страница 19: ...cal clearance of 6 152mm above the appliance to a maximum 6 152mm depth of a non combustible mantel Follow projection 1 25mm up for every 1 25mm deeper 4 1 2 Adjacent Sidewall Requirements The adjacen...

Страница 20: ...4 114mm 135 8 348mm 6 152mm 40 1030mm TRIM 19mm 371 8 943mm 15 393mm 38 985mm 47 1200mm 455 8 1158mm 163 8 416mm 1 25mm 6 152mm 40 1030mm TRIM 19mm 371 8 943mm 15 393mm 4 114mm 5 126mm Clearances to c...

Страница 21: ...To remove safety screen lift the screen up and out of slots 4 2 2 Overlay Designs SP41 POL SP41A POL 1 If installed remove the safety barrier screen 2 Center the overlay over the safety screen 3 Loca...

Страница 22: ...sing its individual manual shut off valve A listed and Commonwealth of Massachusetts approved 1 2 13mm tee handle manual shut off valve and flexible gas connector are to be connected to the 1 2 13mm c...

Страница 23: ...Feet Meters Flat to 6 12 1 0 0 30 Over 6 12 to 7 12 1 25 0 38 Over 7 12 to 8 12 1 5 0 46 Over 8 12 to 9 12 2 0 0 61 Over 9 12 to 10 12 2 5 0 76 Over 10 12 to 11 12 3 25 0 99 Over 11 12 to 12 12 4 0 1...

Страница 24: ...12 30cm 9 23cm K Clearance to mechanical air supply inlet 6 1 83m 3 91cm above if within 10 3m horizontally Massachusetts 10 3m L Clearance above paved sidewalk or paved driveway located on public pr...

Страница 25: ...Cap Part Number American Metal Products Ameri Vent 4DHCS 4DHC 4DVC 4D14S 4D36S DVCC33 BDM 940033HWS 940033 DVR6 HCP DVR6 HC DVR6 VCLP DVR6 VCH DVR6 SNK14 DVR6 SNK36 Simpson DuraVent 46DVA CL33H 46DVA...

Страница 26: ...that can be knocked out The innermost ring knocked out will create less restriction and the outer most ring knocked out will create the least amount of restriction Refer to section 11 2 2 VENT RESTRIC...

Страница 27: ...FG CO INC KOZY HEAT FIREPLACES 7 4 Vent Installation 7 4 1 Vertical Terminations i Minimum Maximum Vertical Venting 3 914mm minimum vertical length 50 15 24m maximum vertical length termination cap A...

Страница 28: ...ise Maximum Horizontal Run 9 228mm minimum vertical rise 90 horizontal elbow 8 2 4m maximum horizontal run termination cap See FIGURE 7 2on the following page Minimum 12 305mm Vertical Rise Maximum Ho...

Страница 29: ...the shaded area in FIGURE 7 2 25 7 6m maximum vertical rise 25 7 6m maximum horizontal run 50 15 2m of total length Maximum of 5 90 elbows For each additional 90 elbow used after the first elbow 3 914...

Страница 30: ...the exhaust gases and intake air through the existing Class A chimney masonry chimney 7 5 1 4 Flex Pipe Venting Configurations IMPORTANT Horizontal vent sections require at least 1 4 6mm rise for eve...

Страница 31: ...ANT Horizontal vent sections require at least 1 4 6mm rise for every 12 305mm of travel IMPORTANT Careshouldbetakenwheninstallingflexiblepipetoavoid a tight bend that may cause abrasion or damage to t...

Страница 32: ...exterior wall with 4 screws not provided 4 Follow vent manufacturer installation instructions for vent installation 7 7 2 Assembly and Installation 5 Attach vinyl siding protector G not shown 6 Mount...

Страница 33: ...artment access panel 1 Locate 2 spring loaded latches securing the glass assembly at the bottom of the firebox 2 Pull the spring loaded latches out and down to release the bottom of the glass assembly...

Страница 34: ...instructions and illustrations for proper log placement 1 Place log SP41 1A on the back log plate 2 Place log SP41 2A on the left front log plate 3 Place log SP41 3A on the right front log plate 4 Di...

Страница 35: ...floor 10 Lift the control board out of the firebox being careful not to damage the sealing gasket underneath 8 3 2 Control Board Installation 1 Place control board in the firebox aligning the holes i...

Страница 36: ...m this plug 9 1 Electrical Specifications This appliance when installed must be electrically grounded in accordance with local codes or in the absence of local codes with the National Electrical Code...

Страница 37: ...n all electric power to the appliance 10 Press the wireless remote POWER button 11 If the appliance will not operate follow the instructions To Turn Off Gas To Appliance and call your service technici...

Страница 38: ...g the UP and DOWN arrows highlight the PILOT icon and press SELECT 3 Use the UP and DOWN arrows to turn the pilot on demand ON or OFF then press SELECT A single beep will be emitted from the control m...

Страница 39: ...into a standby mode if no buttons are pressed within 5 minutes Press the POWER button to reactivate the remote control to ON mode Active functions will be displayed once in ON mode POWER BUTTON MENU...

Страница 40: ...Appliance With the system in the ON position press the remote control POWER button to turn OFF the appliance Functions AUX1 AUX2 and Pilot on Demand can be accessed when the remote control is OFF Onl...

Страница 41: ...ction 1 Press the MENU button to activate the menu 2 Using the UP and DOWN arrows highlight the THERMO icon and press SELECT 3 Use the UP and DOWN arrows to turn the THERMO ON or OFF then press SELECT...

Страница 42: ...The timer operates in increments of 15 30 45 60 90 120 and 180 minutes To activate this function 1 Press the MENU button to activate the menu 2 Using the UP and DOWN arrows highlight the TIMER icon an...

Страница 43: ...etween the minimum and maximum recommended pressure settings 4 Turn off burner and pilot 5 Disconnect hose and tighten the inlet IN pressure tap by turning screw clockwise Screw should be snug Do not...

Страница 44: ...on the glass check log placement before adjusting the venturi 1 Open control compartment access panel 2 Remove the safety barrier and glass frame assembly 3 Remove the log set and lava rock 4 Remove r...

Страница 45: ...ing the baffle Lift the baffle out of slots on the firebox back wall 4 Bend the tabs on the restrictor plate included in components packet to approximately 80 angles This will create tension when the...

Страница 46: ...elector switch not set properly Verify the ON OFF REMOTE selector switch is ON mode or REMOTE mode Gas supply turned off Check remote shut off valves from the appliance Usually there is a valve near t...

Страница 47: ...opane tank Refill if necessary Incorrect glass assembly installation Refer to section 8 1 GLASS FRAME ASSEMBLY on page 46 Incorrect vent cap installation Adjust if necessary Vent cap blockage Remove d...

Страница 48: ...remove debris from vent cap if necessary No reaction to command Battery back batteries or remote control batteries low Replace batteries No communication between remote control and control module Rep...

Страница 49: ...o section 7 0 VENTING on page 25 Performed by Qualified Service Person Frequency Annually Action Examination of the vent system is required Inspect the condition of vent and vent terminal for sooting...

Страница 50: ...flame safety system Pilot or Flame rectification device Visually check pilot light when in operation Inspect and ensure the lighting of the main burner occurs within 4 seconds of the main gas valve o...

Страница 51: ...Burner Orifice 1 55mm DEX A1WH AUX 1 Wire Harness NCK SP41L D Dexen Conversion Kit Natural Gas DEX 191 NG Dexen PSE IPI Pilot Assembly 700 191 LCK SP41L D Dexen Conversion Kit Propane DEX 191 1 Propan...

Страница 52: ......

Страница 53: ...s warranty does not cover installation and operational related problems such as environmental conditions nearby trees buildings hilltops mountains inadequate venting or ventilation excessive offsets n...

Страница 54: ......

Отзывы: