![kozy heat SP-41-L Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/kozy-heat/sp-41-l/sp-41-l_installation-and-operation-manual_1999792027.webp)
Vent Installation
SECTION 7
VENTING
#SP-41-L
R.6 February 2022
27
HUSSONG MFG. CO., INC.
KOZY HEAT FIREPLACES
7.4 Vent Installation
7.4.1 Vertical Terminations
(i)
Minimum / Maximum Vertical Venting:
3’ (914mm) minimum vertical length / 50’ (15.24m) maximum
vertical termination cap
A
i
DIAG. 1
VERTICAL TERMINATIONS NATURAL GAS AND PROPANE
(A)
Termination Cap