![kozy heat SP-41-L Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/kozy-heat/sp-41-l/sp-41-l_installation-and-operation-manual_1999792012.webp)
Stand-off Assembly and Installation
SECTION 3
FRAMING
#SP-41-L
R.6 February 2022
12
HUSSONG MFG. CO., INC.
KOZY HEAT FIREPLACES
3.2 Stand-off Assembly and Installation
WARNING: The top stand-offs brackets provide the required minimum
clearance to the header. The 1” (25mm) top stand-off flange
accommodates 1/2” (12mm) combustible facing material (sheetrock).
The clearance to header must be maintained.
Top stand-off brackets must be formed and attached prior to
positioning fireplace into framed opening.
1. Remove and save (4) screws securing the stand-off brackets on
top of the fireplace.
2. Form each stand-off bracket by bending at perforations,
as shown.
3. Align the holes in the formed stand-off brackets with
the holes on top of the fireplace. Secure with (4) screws
previously removed.
Stand-off brackets, as shipped
Stand-off brackets installed
FIGURE 3.1
Stand-off Assembly and Installation