Seatex AIS 100 Instruction Manual, rev. 5
Installation
34
•
Preparing power cable from power source to the connection box
Installations that should be carried out by
authorised personnel:
•
Connecting power to the connection box and applying power to
the mobile station
•
Providing position interface from the vessel main GPS/GNSS
sensor to the AIS mobile station
•
Providing heading interface from the vessel main heading sensor
to the AIS mobile station
•
Termination of pilot plug cable in junction box
•
Installation of pilot plug
•
Providing other interfaces from external sensors to the AIS mobile
station
•
Configuring the AIS mobile station
•
Verifying that the unit works satisfactory in accordance with the
IMO requirements
In the following you will find detailed descriptions on how to install
the Seatex AIS 100.
5.2
AIS 100 MKD
Typically the MKD unit is installed in a dedicated hole in one of the
bridge consoles or fitted to the bulkhead at a place where the
information easily can be monitored by the navigator. For the physical
installation, screws can be mounted in the four holes hidden behind
the cover on each corner of the unit or used to fasten the bracket
following the MKD. Ensure enough space behind the MKD unit for
connecting the Amphenol connector properly without bending the
cable.
Figure 9 Rear side of the MKD unit and interconnection plug
Содержание Seatex AIS 100
Страница 1: ...Seatex AIS 100 Instruction Manual...
Страница 2: ...Blank page...
Страница 4: ...iv Blank page...
Страница 8: ...viii Blank page...
Страница 20: ...Seatex AIS 100 Instruction Manual rev 5 Operation 12 Blank page...
Страница 40: ...Seatex AIS 100 Instruction Manual rev 5 Technical specifications 32 Blank page...
Страница 92: ...Seatex AIS 100 Instruction Manual rev 5 External interfaces 84 Blank page...
Страница 100: ...Seatex AIS 100 Instruction Manual rev 5 Maintenance 92 Blank page...
Страница 104: ...Seatex AIS 100 Instruction Manual rev 5 Troubleshooting 96 Blank page...
Страница 106: ...Seatex AIS 100 Instruction Manual rev 5 Parts list 98 Blank page...
Страница 109: ...Seatex AIS 100 Instruction Manual rev 5 Appendix B Declaration of conformity 101 Appendix B Declaration of Conformity...
Страница 110: ...Seatex AIS 100 Instruction Manual rev 5 Appendix B Declaration of conformity 102 Blank page...
Страница 113: ...Seatex AIS 100 Instruction Manual rev 5 Index 105 Voyage Data 13 14 21 85 VTS 3 W warranty 27 Z Zone 17 18...