Operation
3.4 Transport
WA70-7 – VENAM02003
3-103
3.4.3
Lifting the machine
WARNING
Lifting operations using a crane must be carried out by a
qualified operator.
Use a suitable lifting traverse. Use suitable lifting traverses
to ensure that the maximum diagonal pull of 10° is not
exceeded.
Lifting traverse, slings and attachment points must be
inspected regularly and before operation for: cracks, defor-
mations, wear and excessive corrosion.
The lifting point of the traverse must lie above the center of
gravity.
Never lift the machine with any worker on it.
Keep the machine horizontal when lifting it.
Lock the articulated steering before lifting the machine.
Engage the work equipment lock lever.
Danger of injury! Objects placed on the machine may drop
when the machine is lifted. Remove all loose objects from
the machine before lifting it.
ATTENTION
Incorrectly attached ropes may damage the machine! Attach
the hooks to the marked attachment points only.
Check the attachment points for possible damage before
and after lifting, particularly when transporting frequently.
When the machine is raised, check that there is no oil leak-
age from the hydraulic circuits.
NOTICE
This lifting procedure applies to machines with standard specifi-
cations. The method of lifting differs according to the attach-
ments and options actually installed. In such cases, please
contact your Komatsu distributor for information.
For details on the weight please see 6.1 “Technical data” (6-2).
Содержание WA70-7
Страница 2: ......
Страница 3: ...Foreword WA70 7 VENAM02003 1 1 1 Foreword...
Страница 23: ...Foreword 1 5 Table of contents WA70 7 VENAM02003 1 21 Blank for technical reason...
Страница 28: ...1 7 Equipment Foreword 1 26 WA70 7 VENAM02003...
Страница 75: ...Operation WA70 7 VENAM02003 3 1 3 Operation...
Страница 114: ...3 2 Descriptions of the individual elements Operation 3 40 WA70 7 VENAM02003 Fuse allocation...
Страница 185: ...Troubleshooting WA70 7 VENAM02003 4 1 4 Troubleshooting...
Страница 203: ...Maintenance WA70 7 VENAM02003 5 1 5 Maintenance...
Страница 276: ...5 8 Maintenance procedure Maintenance every 2000 service hours Maintenance 5 74 WA70 7 VENAM02003...
Страница 277: ...Technical data WA70 7 VENAM02003 6 1 6 Technical data...
Страница 283: ...Special equipment attachments WA70 7 VENAM02003 7 1 7 Special equipment attachments...
Страница 291: ...Index WA70 7 VENAM02003 8 1 8 Index...
Страница 296: ...8 1 Index Index 8 6 WA70 7 VENAM02003...
Страница 297: ...Notes WA70 7 VENAM02003 9 1 9 Notes...
Страница 298: ...Notes 9 2 WA70 7 VENAM02003...
Страница 299: ...Notes WA70 7 VENAM02003 9 3...
Страница 300: ...Notes 9 4 WA70 7 VENAM02003...
Страница 301: ...Notes WA70 7 VENAM02003 9 5...
Страница 302: ...Notes 9 6 WA70 7 VENAM02003...