5
×
NO.0050
Adjustment of work equipment EPC lever detent
position
6
×
Assembly procedure
*Perform the following correction with the engine stopped.
⑤
-1. Lower the boom to the ground.
⑥
-1. Stop and hold the boom lever just before the RAISE detent position.
⑦
-1. Press the ENTER switch, and the lever voltage is read and the standard value is
changed and saved.
⑧
-1. When the display changes to "1", setting is completed.
1-2. Adjustment of each EPC lever
*After performing steps
①
to
④
of No. 0050 "Adjustment of work equipment EPC lever
detent position", perform the following work.
The screen displays the "Work equipment EPC lever detent set" in previous step
④
.
[Adjustment of boom RAISE detent position]
Boom Raise Adjustment
1
0: Waiting
1: OK
2: NG
Q'ty
Name
Q'ty
Others
3
×
Precautions
Tools to be used
Name
Facilities to be used
4
×
*Perform the following correction with the engine stopped.
⑤
-1. Lower the boom to the ground.
⑥
-1. Stop and hold the boom lever just before the RAISE detent position.
⑦
-1. Press the ENTER switch, and the lever voltage is read and the standard value is
changed and saved.
⑧
-1. When the display changes to "1", setting is completed.
1-2. Adjustment of each EPC lever
*After performing steps
①
to
④
of No. 0050 "Adjustment of work equipment EPC lever
detent position", perform the following work.
The screen displays the "Work equipment EPC lever detent set" in previous step
④
.
[Adjustment of boom RAISE detent position]
Boom Raise Adjustment
1
0: Waiting
1: OK
2: NG
⑨
-1. If the ENTER switch is pressed while the lever output voltage is below the standard
value (out of the design range), the display changes to "2" and adjustment is canceled.
Boom Raise Adjustment
0: Waiting
1: OK
2: NG
2
⑩
-1. Finish the adjustment mode with the RETURN switch.
If the RETURN switch is pressed during adjustment, adjustment is finished even in the
calibration process.
Others
1 ×
2 ×
*Perform the following correction with the engine stopped.
⑤
-1. Lower the boom to the ground.
⑥
-1. Stop and hold the boom lever just before the RAISE detent position.
⑦
-1. Press the ENTER switch, and the lever voltage is read and the standard value is
changed and saved.
⑧
-1. When the display changes to "1", setting is completed.
1-2. Adjustment of each EPC lever
*After performing steps
①
to
④
of No. 0050 "Adjustment of work equipment EPC lever
detent position", perform the following work.
The screen displays the "Work equipment EPC lever detent set" in previous step
④
.
[Adjustment of boom RAISE detent position]
Boom Raise Adjustment
1
0: Waiting
1: OK
2: NG
⑨
-1. If the ENTER switch is pressed while the lever output voltage is below the standard
value (out of the design range), the display changes to "2" and adjustment is canceled.
Boom Raise Adjustment
0: Waiting
1: OK
2: NG
2
⑩
-1. Finish the adjustment mode with the RETURN switch.
If the RETURN switch is pressed during adjustment, adjustment is finished even in the
calibration process.
17
Содержание WA470-7
Страница 1: ...WHEEL LOADER Field Assembly Instruction GEN00122 00 WA470 7 SERIAL NUMBERS 10001 and up...
Страница 3: ......
Страница 42: ......