![Komatsu WA470-7 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/komatsu/wa470-7/wa470-7_assembly-instruction-manual_1991103019.webp)
5
×
NO.0050
Adjustment of work equipment EPC lever detent
position
6
×
Assembly procedure
④
Press the ENTER switch, and the work equipment EPC lever detent set screen appears.
Boom Raise Adjustment
0
0: Waiting
1: OK
2: NG
SET; Set
SET
SET
Boom Lower Adjustment
0
0: Waiting
1: OK
2: NG
SET; Set
SET
SET
Boom RAISE
Boom LOWER
Bucket Tilt Adjustment
Q'ty
Name
Q'ty
Others
3
×
Precautions
Tools to be used
Name
Facilities to be used
4
×
*After performing steps
①
to
④
of this process, perform adjustment steps
⑤
and after in
"Adjustment of each EPC lever" on the following page.
④
Press the ENTER switch, and the work equipment EPC lever detent set screen appears.
Boom Raise Adjustment
0
0: Waiting
1: OK
2: NG
SET; Set
SET
SET
Boom Lower Adjustment
0
0: Waiting
1: OK
2: NG
SET; Set
SET
SET
Boom RAISE
Boom LOWER
Bucket Tilt Adjustment
0
SET
0: Waiting
1: OK
2: NG
SET; Set
Bucket TILT
1 ×
2 ×
*After performing steps
①
to
④
of this process, perform adjustment steps
⑤
and after in
"Adjustment of each EPC lever" on the following page.
④
Press the ENTER switch, and the work equipment EPC lever detent set screen appears.
Boom Raise Adjustment
0
0: Waiting
1: OK
2: NG
SET; Set
SET
SET
Boom Lower Adjustment
0
0: Waiting
1: OK
2: NG
SET; Set
SET
SET
Boom RAISE
Boom LOWER
Bucket Tilt Adjustment
0
SET
0: Waiting
1: OK
2: NG
SET; Set
Bucket TILT
16
Содержание WA470-7
Страница 1: ...WHEEL LOADER Field Assembly Instruction GEN00122 00 WA470 7 SERIAL NUMBERS 10001 and up...
Страница 3: ......
Страница 42: ......