TRANSPORTATION (high reach demolition equipment fitted)
HIGH REACH DEMOLITION EQUIP-
7-46
6.
Carefully lower the work equipment into the parked position. Exit the cab carefully - the floor is higher above
the ground than before.
7.
Secure the machine and reconnect the trailer neck. If the transport pin is not already installed, install it now.
REMARK
Carry out this operation in reverse when unloading the machine from the trailer.
TRANSPORTATION (demolition digging equipment fitted)
7
PROCEDURE FOR LOADING ON TO TRAILER
7
1.
Follow the same procedure as outlined for the standard excavator (see main machine manual).
CAUTION
Make sure that the additional counterweight is removed
when the demolition digging equipment is fitted.
TRANSPORTATION (high reach demolition equipment alone)
7
PROCEDURE FOR LOADING ON TO TRAILER
7
CAUTION
It is the responsibility of the transporting company to ensure
that the load is secure and safe.
This procedure includes the following basic steps:
1.
Prepare the work equipment.
2.
Approach the trailer.
3.
Install the equipment onto the trailer.
4.
Detach the work equipment and move machine away.
PREPARING HIGH REACH WORK EQUIPMENT FOR TRANSPORT
1.
There must be plenty of room available to manoeuvre the
machine for removal of work equipment. Make sure the oper-
ations are carried out in a flat, level, spacious area.
Содержание PC450-8
Страница 2: ......
Страница 3: ...FOREWORD 11 ...
Страница 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Страница 267: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section ...
Страница 351: ...SPECIFICATIONS 15 ...
Страница 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Страница 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Страница 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Страница 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Страница 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Страница 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Страница 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Страница 469: ...INDEX 18 ...
Страница 470: ...INDEX 8 2 ...
Страница 473: ...COLOPHON 18 ...