OPERATION
TRANSPORTATION
3-183
Increasing Track Gauge
1.
Remove center frame mounting bolts (1) (front + rear: each
4 bolts) from the front and rear of the track frame on the
side to be extended.
2.
Swing the upper structure to the opposite side to where the
track frame gauge is to be increased, set it at 90° to track
frame (2), then use the work equipment to jack up the track
frame.
REMARK
Height (H) of the track frame being raised should be less than
50 mm. Take care not to raise the track frame so much that the
stopper bolt is distorted.
3.
Using the arm, pull the machine to the front.
The track frame will slide.
4.
Extend the track frame until it comes into contact with the
stopper, then lower the machine slowly to the ground.
Install bolts (1) (front + rear: each 9 bolts) and tighten to
specified torque.
q
Tightening torque: 1520 - 1910 Nm
(155 - 195 kgm)
5.
Follow the same procedure to retract the track frame on
the other side.
Содержание PC450-8
Страница 2: ......
Страница 3: ...FOREWORD 11 ...
Страница 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Страница 267: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section ...
Страница 351: ...SPECIFICATIONS 15 ...
Страница 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Страница 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Страница 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Страница 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Страница 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Страница 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Страница 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Страница 469: ...INDEX 18 ...
Страница 470: ...INDEX 8 2 ...
Страница 473: ...COLOPHON 18 ...