![Komatsu PC450-8 Скачать руководство пользователя страница 446](http://html1.mh-extra.com/html/komatsu/pc450-8/pc450-8_operation-and-maintenance-manual_1991264446.webp)
DEMOLITION DIGGING BOOM INSTALLATION AND REMOVAL
HIGH REACH DEMOLITION EQUIP-
7-36
3.
Make sure all of the exposed wear surfaces of the demolition
digging boom and demolition first boom are clean and show-
ing no signs of damage.
WARNING
Do not extend the boom raise cylinders to lift the Digging
Equipment Support off the ground. It may cause damage
and serious injury.
4.
Carefully approach the digging equipment, taking care not to
strike it with the machine. Raise the demolition boom 1 to
connect with the upper pin of the demolition digging boom, so
that the weight of the digging equipment is supported by the
demolition first boom.
5.
Withdraw the spring pins connecting the Support Braces
(Item 3) of the digging equipment stand to the Left and Right
Support (Items 1 and 2).
6.
Withdraw the pins connecting the Support Braces (Item 3) to
Left and Right Support (Item 1 and 2).
7.
Withdraw the spring pins from the pins connecting the digging
boom to the Left and Right Support.
8.
Withdraw the pins connecting the digging boom to the Left
and Right Support.
REMARK
It may be necessary to adjust the position of the boom raise cylin-
ders to allow easy withdrawal of the pins.
9.
Store the components of the work equipment stand in a safe
and clean environment.
10. Raise the boom so that the digging equipment rotates around
the upper pin. Continue lifting the boom until the required
lower bore in the digging boom is aligned with the hydrauli-
cally adjusting pins of the demolition first boom.
WARNING
Make sure that the changeover valve on the demolition first
boom is set to "Pin Retract".(C - no power to hydraulic pins;
D - power to hydraulic pins).
SLOWLY
Lift to attach boom
Lift to rotate boom
Rotation
Содержание PC450-8
Страница 2: ......
Страница 3: ...FOREWORD 11 ...
Страница 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Страница 267: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section ...
Страница 351: ...SPECIFICATIONS 15 ...
Страница 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Страница 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Страница 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Страница 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Страница 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Страница 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Страница 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Страница 469: ...INDEX 18 ...
Страница 470: ...INDEX 8 2 ...
Страница 473: ...COLOPHON 18 ...