MAINTENANCE
MAINTENANCE PROCEDURE
4-43
3.
Lower the work equipment to the ground and set the
machine in a stable condition.
4.
Set lock lever (1) to LOCK position (L) and stop the engine.
5.
Remove the floor mat holder plate (4).
6.
Pull the knob of floor mat holder clip (5) and remove clip
(5).
7.
Remove the floor mat.
8.
Remove the cap from water drain hole (3).
9.
Flush out the dirt on the floor directly with water through
water drain hole (3).
10. After completing the washing operation, install the cap in
water drain hole (3).
11. Fit the floor mat, then secure it with floor mat holder plate
(4).
12. Secure the floor mat in position with the floor mat holder
clip (5).
Содержание PC450-8
Страница 2: ......
Страница 3: ...FOREWORD 11 ...
Страница 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Страница 267: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section ...
Страница 351: ...SPECIFICATIONS 15 ...
Страница 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Страница 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Страница 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Страница 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Страница 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Страница 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Страница 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Страница 469: ...INDEX 18 ...
Страница 470: ...INDEX 8 2 ...
Страница 473: ...COLOPHON 18 ...