HIGH REACH DEMOLITION EQUIPMENT 27M
MACHINE OPERATIONS AND CONTROLS
7-15
MACHINE OPERATIONS AND CONTROLS
7
BEFORE STARTING ENGINE
7
Always carry out the following inspection and maintenance before
starting work each day.
q
Greasing
Supply grease to the greasing points shown in the diagram.
q
Check for cracks, furrows in the base metal.
q
Check for wear and damage to the base metal.
q
Perform all checks required by the basic machine manual.
1.
Boom top pin (1 place)
6.
Arm (2 places)
2.
Intermediate link cylinder (2 places)
7.
Bucket cylinder (2 places)
3.
Boom cylinder (4 places)
8.
Arm cylinder (2 places)
4.
Boom foot (2 places)
9.
Intermediate link top pin (1 place)
5.
Link (3 places)
10.
Boom connect pins (2 places
Содержание PC450-8
Страница 2: ......
Страница 3: ...FOREWORD 11 ...
Страница 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Страница 267: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section ...
Страница 351: ...SPECIFICATIONS 15 ...
Страница 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Страница 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Страница 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Страница 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Страница 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Страница 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Страница 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Страница 469: ...INDEX 18 ...
Страница 470: ...INDEX 8 2 ...
Страница 473: ...COLOPHON 18 ...