![Komatsu PC450-8 Скачать руководство пользователя страница 163](http://html1.mh-extra.com/html/komatsu/pc450-8/pc450-8_operation-and-maintenance-manual_1991264163.webp)
OPERATION
DETAILED CONTROLS AND GAUGES
3-97
Defroster Operation
1.
Press fan switch (2) and adjust the air flow. When doing
this, check that temperature setting (a) and air flow (b) are
displayed on monitor (7).
2.
Press vent selector switch (4) and set vent display on the
display monitor to (f) or (g) as shown in diagram on the
right.
3.
Press RECIRC/FRESH selector switch (6) and set it to
take in fresh air.
Содержание PC450-8
Страница 2: ......
Страница 3: ...FOREWORD 11 ...
Страница 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Страница 267: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section ...
Страница 351: ...SPECIFICATIONS 15 ...
Страница 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Страница 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Страница 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Страница 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Страница 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Страница 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Страница 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Страница 469: ...INDEX 18 ...
Страница 470: ...INDEX 8 2 ...
Страница 473: ...COLOPHON 18 ...