MACHINE CONFIGURATION FOR THE INSTALLATION OF ATTACHMENTS
270
WEAM012101
6.4.2.3 BLEEDING
1.
After connecting the pipes, start the engine and let it idle for approximately 10 minutes (see "3.3.2 AFTER
STARTING THE ENGINE" ).
2.
Extend all cylinders 4-5 times, stopping them at approx. 100 mm from the end of stroke.
IMPORTANT
q
If the engine runs at maximum rpm or if the cylinders are brought to the end of stroke soon after starting,
the air sucked in by the cylinders may damage the piston gaskets.
3.
Slowly make all cylinders reach the end of stroke for 3-4 times.
4.
Press the optional equipment control pedal a dozen times to bleed the equipment circuit completely.
IMPORTANT
q
If the equipment bleeding procedure is explained in the specific manual of the equipment supplied by its
manufacturer, follow the instructions contained therein.
5.
Once the bleeding operation has been completed, stop the engine and wait at least 5 minutes before starting
work.
6.
Make sure that there are no oil leakages and clean any dirty surface.
Содержание PC18MR-3
Страница 2: ......
Страница 16: ...14 THIS PAGE WAS INTENTIONALLY LEFT EMPTY...
Страница 24: ...22 PAGE INTENTIONALLY LEFT BLANK...
Страница 25: ...SAFETY AND ACCIDENT PREVENTION 23...
Страница 78: ...76 PAGE INTENTIONALLY LEFT BLANK...
Страница 79: ...THE MACHINE AND ITS OPERATIONS 77...
Страница 192: ...190 PAGE INTENTIONALLY LEFT BLANK...
Страница 193: ...MAINTENANCE 191...
Страница 255: ...TECHNICAL SPECIFICATIONS 253...
Страница 263: ...AUTHORISED OPTIONAL EQUIPMENT 261...
Страница 282: ...280 THIS PAGE WAS INTENTIONALLY LEFT EMPTY...
Страница 283: ......
Страница 284: ...2010 KOMATSU UTILITY EUROPE S p A All Rights Reserved Printed in Europe 06 2010...