TRANSPORTING THE MACHINE
168
WEAM012101
During the loading and unloading operations, always use ramps or a platform and proceed as indicated below.
LOADING THE MACHINE
1.
Load and unload the machine on/from the trailer on firm and
level ground only, and widen the track gauge.
Keep a safety distance from the edge of the road.
2.
Operate the trailer brake and fit chocks (1) under the wheels
to prevent the trailer from moving.
Fit the ramps (2), with a maximum gradient of 15° (3) and
spaced equally from both sides of the trailer.
3.
Run the engine at low speed.
(A): Idling
4.
Make sure that the travel speed increase warning light is off.
NOTE
q
If the warning light is on, press the translation speed selector
switch located on the blade control lever grip. The warning light
will go out and the low speed will be selected.
RKA23970
Содержание PC18MR-3
Страница 2: ......
Страница 16: ...14 THIS PAGE WAS INTENTIONALLY LEFT EMPTY...
Страница 24: ...22 PAGE INTENTIONALLY LEFT BLANK...
Страница 25: ...SAFETY AND ACCIDENT PREVENTION 23...
Страница 78: ...76 PAGE INTENTIONALLY LEFT BLANK...
Страница 79: ...THE MACHINE AND ITS OPERATIONS 77...
Страница 192: ...190 PAGE INTENTIONALLY LEFT BLANK...
Страница 193: ...MAINTENANCE 191...
Страница 255: ...TECHNICAL SPECIFICATIONS 253...
Страница 263: ...AUTHORISED OPTIONAL EQUIPMENT 261...
Страница 282: ...280 THIS PAGE WAS INTENTIONALLY LEFT EMPTY...
Страница 283: ......
Страница 284: ...2010 KOMATSU UTILITY EUROPE S p A All Rights Reserved Printed in Europe 06 2010...