PRECAUTIONS TO BE TAKEN WHEN WORKING
WEAM012101
51
4 - BRING THE LOAD NEARER IN HORIZONTAL DIRECTION
With an arm extended forwards and the hand in vertical posi-
tion directed towards the signalman, move the hand in the di-
rection of the movement to be carried out.
5 - LIFT THE BOOM
With an arm extended in horizontal position and closed fin-
gers, point the thumb upwards.
6 - LOWER THE BOOM
With an arm extended in horizontal position and closed fin-
gers, point the thumb downwards.
7 - SWING THE BOOM
With an arm extended in horizontal position, point the forefin-
ger in the desired swing direction.
8 - SWING THE BOOM
With an arm extended in horizontal position, point the forefin-
ger in the desired swing direction.
9 - FOLD THE ARM
With both hands clasped, point the thumbs inwards.
RKA15170
RKA15180
RKA15190
RKA15200
RKA15210
RKA15220
Содержание PC18MR-3
Страница 2: ......
Страница 16: ...14 THIS PAGE WAS INTENTIONALLY LEFT EMPTY...
Страница 24: ...22 PAGE INTENTIONALLY LEFT BLANK...
Страница 25: ...SAFETY AND ACCIDENT PREVENTION 23...
Страница 78: ...76 PAGE INTENTIONALLY LEFT BLANK...
Страница 79: ...THE MACHINE AND ITS OPERATIONS 77...
Страница 192: ...190 PAGE INTENTIONALLY LEFT BLANK...
Страница 193: ...MAINTENANCE 191...
Страница 255: ...TECHNICAL SPECIFICATIONS 253...
Страница 263: ...AUTHORISED OPTIONAL EQUIPMENT 261...
Страница 282: ...280 THIS PAGE WAS INTENTIONALLY LEFT EMPTY...
Страница 283: ......
Страница 284: ...2010 KOMATSU UTILITY EUROPE S p A All Rights Reserved Printed in Europe 06 2010...