The average value of the daily working fuel consumption in
the last 1 week is displayed as shown in the figure.
3.
Press enter switch (2).
The pop-up window of the data reset is displayed.
Press return switch (3), and the screen returns to “Payload
Meter” menu.
4.
Press enter switch (2) while the pop-up window shown in
the figure is displayed.
“Average Fuel Consumption Record” is reset and the pop-
up window closes.
If you press return switch (3), nothing is done and the pop-
up window closes.
SETTING MACHINE ID AND OPEN ID
You can change the setting of the machine ID and open ID which are items in the cycle data.
You can check the operator and load of each cycle by setting the machine No. as the machine ID and setting
the operator and the load type as the open ID.
1.
Press menu switch (1) on the standard screen and display
“Machine Setting and Information” menu. Select “Payload
Meter” and press enter switch (2).
HANDLING PAYLOAD METER
ATTACHMENTS AND OPTIONS
6-14
Содержание HM400-5
Страница 2: ......
Страница 23: ...LOCATION OF SAFETY LABELS SAFETY SAFETY LABELS 2 5 ...
Страница 24: ...SAFETY LABELS SAFETY 2 6 ...
Страница 60: ......
Страница 61: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1 ...
Страница 322: ......
Страница 323: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 ...
Страница 409: ...SPECIFICATIONS 5 1 ...
Страница 411: ...SPECIFICATIONS SPECIFICATIONS 5 3 ...
Страница 412: ......
Страница 413: ...ATTACHMENTS AND OP TIONS Before reading this chapter read and understand the SAFETY 6 1 ...
Страница 430: ......
Страница 431: ...REPLACEMENT PARTS 7 1 ...
Страница 446: ...HM400 5 ARTICULATED DUMP TRUCK Form No EENAM03380 2015 KOMATSU All Rights Reserved Printed in Belgium 09 2015 ...