
1) Remove all soil and sand from the top of the track frame
and top of cover (1).
2) Stand on the straight frame, and remove the cover (1)
through the track frame and track shoe (A).
3) Supply grease from above the track shoe.
NOTICE
After working in water or swampy ground, grease each
part.
• Greasing equalizer bar center pin (1 place)
1) Open the engine side cover on the left side of the
machine.
2) Supply grease to the grease fitting shown by arrow.
MAINTENANCE
MAINTENANCE PROCEDURE
4-45
Содержание D155AX-8E0
Страница 2: ......
Страница 11: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVELS 1 9...
Страница 13: ...Evaluation height 1 2m above the ground Scale interval of the circles is 1 m FOREWORD INTRODUCTION 1 11...
Страница 24: ......
Страница 63: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1...
Страница 312: ......
Страница 313: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1...
Страница 397: ...SPECIFICATIONS 5 1...
Страница 403: ...HANDLE HEADREST Keep the headrest inserted to the end ATTACHMENTS AND OPTIONS HANDLE HEADREST 6 5...
Страница 404: ......
Страница 405: ...REPLACEMENT PARTS 7 1...
Страница 420: ...D155AX 8E0 BULLDOZER Form No EENAM03780 2019 KOMATSU All Rights Reserved Printed in Belgium 04 2019...