Preparation
If possible, install the drain to the lavatory before installing the lavatory.
Install the water supplies and drain piping according to the roughing-in
information.
Verify cabinet clearance beneath the countertop to accommodate lavatory basin,
faucet valving, and drain piping.
Cut out the template where indicated for the countertop opening. Cut along the
inside of the cutting line.
Position the template on the countertop to ensure clearance between the lavatory,
faucet, and backsplash.
Trace around the template on the countertop with a pencil.
Mark the faucet hole centerline on the countertop.
Préparation
Si possible, installer le drain au lavabo avant d’installer celui-ci.
Installer les alimentations d’eau et la tuyauterie du drain selon l’information du
plan de raccordement.
Vérifier le dégagement du meuble sous le comptoir afin d’accommoder le bassin
du lavabo, les valves du robinet, et la tuyauterie du drain.
Découper le gabarit à l’emplacement de l’ouverture du comptoir. Découper le long
de la ligne intérieure du découpage.
Positionner le gabarit sur le comptoir de façon à assurer un dégagement entre le
lavabo, le robinet et le dosseret.
Verify cabinet clearance.
Vérifier le dégagement
du meuble.
Verifique el espacio libre
del gabinete.
Cut along the inside line.
Découper le long de la ligne intérieure.
Corte sobre el interior de la línea.
Trace the cut-out.
Tracer la découpe.
Trace la abertura.
1
2
3
Kohler Co.
5
1068257-2-H
Содержание Ricochet K-14280-C6-0
Страница 14: ...1068257 2 H Kohler Co ...
Страница 15: ...Kohler Co 1068257 2 H ...
Страница 16: ...1068257 2 H ...