
TS_616_08 PW8000DPA ST (S2) User Manual 21/4/22
55
4: Installation
4.5
Remote monitoring and control facilities
4.5.1 PW8000DPA ST communications interface
Various optional remote monitoring and control facilities can be connected to the PW8000DPA ST communications
interface located on the front of the UPS frame. These are described on page 17 with connection details contained in
Chapter 8.
Although all the connected optional features will be checked by the commissioning engineer, they can be connected by
the customer installation team at this point provided no external power is applied to the circuits until they have been
properly commissioned.
4.6
Installation completion
This now completes the installation process.
WARNING:
Ensure that power is not applied to any part of the UPS or its connected optional facilities until the
UPS has been commissioned and handed over.
Содержание PowerWAVE 8000DPA RI (S2) Series
Страница 1: ...User Manual PowerWAVE 8000DPA ST S2 10 20 kVA kW Parallelable up to 400 kVA kW...
Страница 2: ...TS_616_08 PW8000DPA ST S2 UK User Manual 21 4 22...
Страница 4: ...TS_616_08 PW8000DPA ST S2 UK User Manual 21 4 22...
Страница 8: ...IV TS_616_08 PW8000DPA ST S2 UK User Manual 21 4 22...