Repair
Service and Repair Manual
Cooling system
u
Position HT collector
1
on aggregate support.
u
Tighten screws
6
to torque.
Fig. 229: Installing pipe
u
Insert o-rings
8
.
u
Position clamp
7
in the pipe middle.
u
Insert A bank pipe
2
into collector.
u
Insert B bank pipe
2
into rocker arm housing.
u
After housing is installed, push pipes to the right until clamp
7
can be placed in its groove.
Fig. 230: Installing water pipe
u
Insert o-rings
8
.
u
Position clamp
7
in middle of pipe
3
.
u
Insert pipe
3
from the left into the rocker arm housing.
u
After housing is installed, push pipe to the right until clamp
7
can be placed in its groove.
204
© 2021 by Kohler Co. All rights reserved.
KD83V16 33525088901_2_1 EN_US
2021-07