Section 4 Operation

4.2.5

Pre- and Post-Transfer Load
Control Sequence

The pre-transfer and post-transfer load control time
delays operate during transfer between two live
sources, such as during a loaded test sequence or a
loaded exercise. The load control LED lights when the
pre- and post-transfer signals are active.

The pre-transfer load control time delays overlap the
preferred-to-standby and standby-to-preferred time
delays. The longer delay determines the time delay
before transfer.

The timelines in Figure 4-13 illustrate the pre-transfer
time delay sequence using the default settings. (The
default settings for the post-transfer signals are equal to
zero.) The default setting for the preferred-to-standby
time delay is 1 second, and the default setting for the
pre-transfer time delay is three seconds. The time delay
before transfer is equal to the longer time delay, which is
3 seconds. When transferring back to the preferred
source, the standby-to-preferred time delay is 15
minutes. The pre-transfer signal operates during the
final 3 seconds before transfer to the preferred source.
The total time delay before transfer back to preferred
(using the default settings) is 15 minutes.

Transfer to Standby

Pre-Transfer Load Control Signal, 3 Seconds

Preferred-to-Standby Time Delay, 1 second

0

3

1

2

Time before Transfer, in Seconds

Transfer to Preferred

Pre-Transfer Load Control Signal, 3 Seconds

Standby-to-Preferred Time Delay, 15 minutes

0

3

15 minutes

Time before Transfer

Figure 4-13

Pre-Transfer Time Delay Operation (default settings)

Содержание KCP MPAC 1000

Страница 1: ...Transfer Switches Operation and Installation Models KCT KCP Power Switching Device Standard Open Transition 30 to 4000 Amps Programmed Transition 150 to 4000 Amps Electrical Controls MPAC 1000t TP 61...

Страница 2: ...ately after unpacking the products so that the numbers are readily available for future reference Record field installed kit numbers after installing the kits Transfer Switch Identification Numbers Re...

Страница 3: ...10 2 5 2 Engine Start Connection 13 2 5 3 Auxiliary Contacts 15 2 5 4 Controller Ground 16 Section 3 Setup and Test 17 3 1 Introduction 17 3 2 User Interface Panel 17 3 2 1 Pushbuttons and LED Indica...

Страница 4: ...on 38 5 3 2 Other Inspections and Service 39 5 4 Service Schedule 40 Section 6 Accessories 41 6 1 Introduction 41 6 2 Setup Program 41 6 3 Control Switches 41 6 3 1 Preferred Source Switch 41 6 3 2 Su...

Страница 5: ...otential hazards and explain how to act safely The decals are shown throughout this publication to improve operator recognition Replace missing or damaged decals Accidental Starting Accidental startin...

Страница 6: ...charger connections while the battery is charging Always turn the battery charger off before disconnecting the battery connections Ventilate the compartments containing batteries to prevent accumulati...

Страница 7: ...disable all generator sets as follows 1 Move all generator set master controller switches to the OFF position 2 Disconnect power to all battery chargers 3 Disconnect all battery cables negative leads...

Страница 8: ...uts for identification NOTICE Improper operator handle usage Use the manual operator handle on the transfer switch for maintenance purposes only Return the transfer switch to the normal position Remov...

Страница 9: ...t for future reference The equipment service requirements are very important to safe and efficient operation Inspect parts often and perform required service at the prescribed intervals Obtain service...

Страница 10: ...nal office Africa Europe Middle East London Regional Office Langley Slough England Phone 44 1753 580 771 Fax 44 1753 580 036 Asia Pacific Power Systems Asia Pacific Regional Office Singapore Republic...

Страница 11: ...et to shut down Figure 1 1 shows a typical installation block diagram 1 2 Nameplate A nameplate attached to the controller cover on the inside of the enclosure door includes a model designation a seri...

Страница 12: ...00 1200 1600 2000 2600 3000 4000 KCT AMTA 0225S SAMPLE MODEL DESIGNATION Mechanism C Automatic B Bypass Isolation See G11 81 N Non automatic Transition T Open Transition P Programmed Transition Power...

Страница 13: ...livery inspect the packaging and the transfer switch for signs of shipping damage Unpack the transfer switch as soon as possible and inspect the exterior and interior for shipping damage If damage and...

Страница 14: ...rill chips and other debris out of the components Cover the solenoid mechanism duringinstallation Afterinstallation usethemanualoperating handle to cycle the contactor to verify that it operates freel...

Страница 15: ...ote A manual operation handle is provided on the transfer switch for maintenance purposes only Do not use the manual operation handle to transfer the load with the power connected Use the manual opera...

Страница 16: ...switch frame See Figure 2 8 2 225 400 amp switches See Figure 2 9 Insert the maintenance handle into the hole in the shaft on the left side of the operator 600 1200 amp switches See Figure 2 10 Insert...

Страница 17: ...ed Transition Switches one operator shown 202 2 1 1 Maintenance handle 2 Hub 1 Figure 2 10 Manual Operation 600 1200 Amp Switches 1 127a 1 Maintenance handle 2 Hub Turn counterclockwise to Emergency T...

Страница 18: ...t in the place provided on the transfer switch when service is completed Manual Operation Test Procedure 150 4000 Amp Programmed Transition Transfer Switches Check the operation of both operators by f...

Страница 19: ...when reconnecting the battery Follow these precautions to prevent starting of the generator set by an automatic transfer switch remote start stop switch or engine start command from a remote computer...

Страница 20: ...o not use a screwdriver to force the contactor mechanism Drill the entry holes Cover the transfer switch to protect it from metal chips and construction grit Then drill entry holes for the conductors...

Страница 21: ...se a compression washer flat washer and a minimum grade 5 bolt and torque the connections to the values in Figure 2 18 Bolt Size Bolt Torque Bolt Size inches ft lbs Nm 1 4 7 9 5 5 16 12 16 3 3 8 20 27...

Страница 22: ...TP 6126 8 02 12 Section 2 Installation ADV 6736 Figure 2 20 Interconnection Diagram...

Страница 23: ...vent starting of the generator set by an automatic transfer switch remote start stop switch or engine start command from a remote computer Prevent the generator set from starting by moving the generat...

Страница 24: ...al block location 2 Decal 3 Engine start contacts 1 and 2 4 Auxiliary contacts 4 27 see the schematic diagram for contacts closed on Normal or closed on Emergency GM21298 GM21311 4 3 1 2 4 5 6 7 8 9 1...

Страница 25: ...iagram provided with the transfer switch to identify which auxiliary contacts are closed on Normal and which are closed on Emergency for 600 4000 amp models Follow the wire size and tightening torque...

Страница 26: ...5 4 Controller Ground Verify that the grounding wire is connected from the controller s lower left mounting stud to the enclosure This connection provides proper grounding that does not rely upon the...

Страница 27: ...d operated using the factory settings for time delays voltage and frequency pickup and dropout and other system parameters To view and change the system settings a personal computer running the MPAC 1...

Страница 28: ...Source E is available Test Red Unloaded test is running Loaded test is running Time Delay LED Bar Amber LEDs step down to indicate time remaining in an active time delay or exercise period Figure 3 2...

Страница 29: ...side of the transfer switch enclosure door It is not necessary to open the cover to access the DIP switches or the PC connector on the circuit board Figure 3 6 shows the locations the DIP switches and...

Страница 30: ...two live sources When the output is activated the contact opens for the programmed length of time before transfer default setting 3 seconds to allow controlled disconnection of selected loads The con...

Страница 31: ...etup program to assign the input functions if they are different from the default assignments shown in Figure 3 7 The main logic board has one programmable output which is factory assigned to the load...

Страница 32: ...e factory set to the default values shown in Figure 3 12 The voltage and frequency debounce time delays prevent nuisance transfers caused by brief spikes and dips in the power supply System Parameter...

Страница 33: ...ery chargers if installed 3 7 Functional Test The functional test includes three checks D Manual Operation Test D Voltage Checks D Automatic Operation Test Note Perform these checks in the order prese...

Страница 34: ...to check the Source N normal phase to phase and phase to neutral if applicable terminal voltages and frequency a If Source N is the utility and the measured input does not match the voltage and frequ...

Страница 35: ...age Will cause severe injury or death Only authorized personnel should open the enclosure DANGER Automatic Operation Test Procedure 1 Check the controller LED indicators to verify that the Position N...

Страница 36: ...No load Run duration 30 minutes Figure 3 14 Exerciser Factory Settings Use the Setup Program to change the exerciser run duration if desired See Section 4 2 3 for more information about the exerciser...

Страница 37: ...ent nuisance transfers during brief power interruptions The voltage and frequency debounce time delays prevent nuisance transfers caused by brief spikes and dips in the power supply See Section 3 5 fo...

Страница 38: ...In phase monitor open transition only as programmed Figure 4 2 ATS Sequence of Operation Return to Normal preferred source LED Indicators Loss of Normal Source N Available N Position OFF Position E Av...

Страница 39: ...e test button is pushed again or until a remote test signal is received If the standby source fails during a test cycle the system immediately transfers back to preferred The test sequence executes al...

Страница 40: ...cts open In phase monitor or transfer to off as programmed A A Test ended See the Setup Program Operation Manual Figure 4 5 Test with Load Sequence System Test N Available N Position OFF Position E Av...

Страница 41: ...ing the exercise run Refer to Section 4 2 5 for additional information about pre transfer time delays Exercise Mode The exerciser is factory set to operate in switch input mode which uses the Exercise...

Страница 42: ...e time period ends or exercise button pressed Load bank control output activated as programmed Load bank control output deactivated as programmed See the Setup Program Operation Manual Figure 4 9 Exer...

Страница 43: ...dby Time Delay programmed transition only X X X X In Phase Synch as programmed N A for programmed transition models X X flashing X X Post Transfer to Standby Load Control X X X X X Pre Transfer to Pre...

Страница 44: ...ram Operation Manual See Figure 4 12 for the sequence of operation Post transfer load control as programmed Transfer to standby source Immediate generator set engine start Pre transfer load control as...

Страница 45: ...o The default setting for the preferred to standby time delay is 1 second and the default setting for the pre transfer time delay is three seconds The time delay before transfer is equal to the longer...

Страница 46: ...enerator set The fault clears when the system acquires a standby source Depress the Lamp Test button until the LEDs flash to clear the Service Required LED 4 3 4 Failure to Transfer If the unit fails...

Страница 47: ...erator set Remove the negative lead first when disconnecting the battery Reconnect the negative lead last when reconnecting the battery WARNING Disabling the generator set Accidental starting can caus...

Страница 48: ...ircuit boards Prevent electrostatic discharge damage by wearing an approved grounding wrist strap when handling electronic circuit boards or integrated circuits An approved grounding wrist strap provi...

Страница 49: ...umulations of dirt dust moisture or other contaminants D Signs of corrosion D Worn missing or broken components D Loose hardware D Wire or cable insulation deterioration cuts or abrasion D Signs of ov...

Страница 50: ...of excessive vibration leakage high temperature contamination or deterioration 5 3 1 X X M Check that all external hardware is in place tightened and not badly worn 5 3 1 X X X M Inspect the inside o...

Страница 51: ...ed on the enclosure door See Figure 6 1 for typical switch locations Note Factory installed switches are factory wired and require no additional wiring in the field 1 ADV 6698A 1 Preferred source swit...

Страница 52: ...ip or I O module outputs to Start Source N Generator and connect the engine start leads for the Source N generator set to the corresponding terminals on the terminal strip or I O module terminals See...

Страница 53: ...oad shed time delays Source N N Source E load shed time delays Source E E In phase monitor synch Source E E Preferred to standby time delay Function N to E E to N Standby to preferred time delay Funct...

Страница 54: ...ervised transfer control switch on an automatic system is in the MANUAL position pressing the Test button or sending a peak shave command causes transfer to the standby source However ending the test...

Страница 55: ...em activates the output after the synch output time delay See Figure 6 6 Parameter Factory setting Enable disable Disable Phase angle degrees 0 Synch output time delay seconds 30 Figure 6 6 In Phase M...

Страница 56: ...age Source E Fault Overvoltage Source E Fault Loss of Phase Source E Fault Phase Rotation Error Source E Fault Overfrequency Source E Fault Underfrequency Source E Fault Failure to Transfer Fault Auxi...

Страница 57: ...harness Figure 6 12 shows the controller connection The input and output ratings are shown in Figure 6 13 Figure 6 14 shows an I O module with its input and output terminal blocks and address DIP swi...

Страница 58: ...ule Address Each I O Module requires a unique address Factory installed I O module addresses are set at the factory To check the I O module addresses compare the DIP switch settings with Figure 6 16 s...

Страница 59: ...position The load shed forced transfer to off accessory is available only for programmed transition transfer switches When the forced transfer to off input is activated contact closed the contactor mo...

Страница 60: ...attery acid cleanup Battery acid can cause severe injury or death Battery acid is electrically conductive and corrosive Add 500 g 1 lb of bicarbonate of soda baking soda to a container with 4 L 1 gal...

Страница 61: ...r to the ATS is disconnected before connecting or disconnecting the 9 pin connector to the battery charger Ring terminals for battery charger connections are included with the battery charger The inst...

Страница 62: ...harger Terminal Size Eyelet Terminal Part No 4 5 m 15 ft 12 AWG No 10 X 283 11 7 5 m 25 ft 10 AWG No 10 X 283 11 Figure 6 21 Battery Cable and Terminal Specifications 6 Slide a red boot onto the red c...

Страница 63: ...oltmeter to check the voltage at the battery and compare the readings to Figure 6 25 or Figure 6 26 to verify charger operation Battery Charger Disconnection Procedure Hazardous voltage Will cause sev...

Страница 64: ...ng gradually tops off your battery and reduces harmful sulfating While both LED s are on the voltage measured with the charger on should be approx 14 0 to 14 5VDC in 12VDC mode or 28 0 to 29 0 in 24VD...

Страница 65: ...place Turn off excessive DC equipment while charging The red and green LEDs stay on for more than 24 On board DC systems are drawing between 1 5 5A Turn off excessive DC equipment while charging y hou...

Страница 66: ...DC at 0 1 Amps Input Rated AC Voltage 208 VAC AC connector pin 2 240 VAC AC connector pin 4 480 VAC AC connector pin 6 600VAC AC connector pin 9 Current Draw 50 60 Hz 0 7 Amps Maximum Maximum Recomme...

Страница 67: ...rclockwise CEC Canadian Electrical Code cfh cubic feet per hour cfm cubic feet per minute CG center of gravity CID cubic inch displacement CL centerline cm centimeter CMOS complementary metal oxide su...

Страница 68: ...aker LCD liquid crystal display ld shd load shed LED light emitting diode Lph liters per hour Lpm liters per minute LOP low oil pressure LP liquefied petroleum LPG liquefied petroleum gas LS left side...

Страница 69: ...second SI Systeme international d unites International System of Units SI EO side in end out sil silencer SN serial number SPDT single pole double throw SPST single pole single throw spec specs speci...

Страница 70: ...22 42 450 J 200 1 5 10 240 VAC max N A 22 240 VAC max 200 240 200 J 225 225 260 3 35 22 42 480 600 J 260 400 3 35 22 42 480 600 J 400 600 800 3 50 50 65 1600 800 1000 1200 3 18 50 36 36 65 200 600 16...

Страница 71: ...HKD KD KDB KDC LCL Tri Pac LA 400 ABB S1 125 ABB S3 150 Merlin Gerin CE104 CE106 100 Square D FC FI 100 Square D KA KC KH KI LA LH 250 TB1 100 GE TEL THED THLC1 THLC2 150 TFL 225 CED6 ED6 HED4 HED6 12...

Страница 72: ...400 CFD6 FD6 FXD6 HFD6 250 ITE CJD6 HHJD6 HHJXD6 HJD6 JD6 JXD6 SCJD6 SHJD6 SJD6 400 200 22 240 KA KC KH KI 250 200 22 240 Square D LC LI 300 q LA LH 400 Cutler Hammer HJD JD JDB JDC 250 Cutler Hammer...

Страница 73: ...ABB S5 400 ABB S6 800 Merlin Gerin CJ600 600 GE TB8 800 GE Microversatrip TKL 1200 CLD6 HHLD6 HHLDX6 HLD6 SCLD6 SHLD6 600 480 ITE CMD6 HMD6 SCMD6 SHMD6 800 480 ITE CND6 HND6 SCND6 SHND6 1200 65 CPD6 1...

Страница 74: ...EC 1000 4 5 Surge Voltage D IEC 1000 4 6 Conducted RF Disturbances D IEC 1000 4 8 Magnetic Fields D IEC 1000 4 11 Voltage Variations and Interruptions Diagrams and Drawings Dimension Drawing Model Sch...

Страница 75: ......

Страница 76: ...Wisconsin 53044 Phone 920 565 3381 Fax 920 459 1646 For the nearest sales service outlet in the US and Canada phone 1 800 544 2444 KohlerPowerSystems com Kohler Power Systems Asia Pacific Headquarters...

Отзывы: