Section 3 Setup and Test
Note:
The generator set may have an engine
cooldown time delay that causes the
generator set engine to run after the transfer
switch engine start signal is removed.
This completes the functional test.
3.8 Exerciser Setup
The installer must activate the exerciser. Press and hold
the Exercise button for approximately 3 seconds until it
flashes to activate the exerciser, start an exercise run,
and set the time and date of the next exercise run. The
exercise time is set to the time that the button is pushed.
The default setting for the exerciser run duration is 30
minutes. The time delay LEDs show the time remaining
in the exercise run. Press and hold the exercise button
again to end the exercise period early, if desired.
Note:
Pressing the end time delay button does
not
end
an exercise run.
Set the exerciser period (every week or every 2 weeks)
and load condition by using DIP switches on the
controller circuit board.
The factory settings for the
exerciser are shown in Figure 3-14.
Exerciser Parameter
Factory Setting
1 week/2 week exercise (DIP switch)
1 week
Disable/enable exercise (DIP switch)
Enable
Load/no load exercise (DIP switch)
No load
Run duration
30 minutes
Figure 3-14
Exerciser Factory Settings
Use the Setup Program to change the exerciser run
duration, if desired.
See Section 4.2.3 for more
information about the exerciser.
The exerciser can be set without starting the generator
set, if necessary. Use the following procedure.
Exerciser Setting Procedure
1. Move the disable/enable exercise DIP switch to the
DISABLE position and close the enclosure door.
The Exercise LED flashes rapidly to indicate that
the exerciser is disabled.
2. Press and hold the exercise button until the
Exercise LED goes out for approximately 3
seconds and then starts to flash again.
3. Move the disable/enable exercise DIP switch back
to the ENABLE position.
4. Close and lock the enclosure door.
5. Verify that the EXERCISE LED is not flashing.
The exerciser time is set to the time that the button is
pushed. The exerciser will run in one or two weeks
according to the 1 week/2 week DIP switch position.
3.9 Warranty Registration
The transfer switch seller must complete a Startup
Notification Form and submit it to the manufacturer
within 60 days of the initial startup date.
A Startup
Notification Form is included with generator sets and
covers all equipment in the standby system. Standby
systems not registered within 60 days of startup are
automatically registered using the manufacturer’s ship
date as the startup date.
Содержание KCP MPAC 1000
Страница 22: ...TP 6126 8 02 12 Section 2 Installation ADV 6736 Figure 2 20 Interconnection Diagram...
Страница 75: ......