TP-6137 5/03
87
Section 10 Generator and Engine Disassembly/Reassembly
High Pressure Line
1. Install the high pressure line and tighten the nuts at
the injector nipple and at the nonreturn valve nipple
located on the fuel injection pump body.
Note:
Perform step 1 while holding the injector and
nonreturn valve nipples with a 14 mm wrench.
See Figure 10-97.
2. Tighten the fuel line nuts with a 17 mm wrench.
Figure 10-97
High Pressure Line
Valve Cover
1. Install the valve cover gasket on the upper surface
of the head. See Figure 10-98.
2. Reinstall the valve cover.
3. Put the synthetic rubber washers under the cover
nuts and tighten at the specified torque.
See
Section 1.5.
Note:
To avoid oil leaks, check and hold the right side of
the gasket on the head during this operation.
Figure 10-98
Valve Cover Gasket
Содержание 3.5EFOZ
Страница 1: ...Marine Generator Sets Includes Engine Maintenance Models 4EOZ 3 5EFOZ TP 6137 5 03 Service ...
Страница 10: ...TP 6137 5 03 VI Safety Precautions and Instructions Notes ...
Страница 12: ...TP 6137 5 03 ii Service Assistance Notes ...
Страница 28: ...TP 6137 5 03 16 Section 3 Scheduled Maintenance Notes ...
Страница 42: ...TP 6137 5 03 30 Section 5 Fuel System Notes ...
Страница 48: ...TP 6137 5 03 36 Section 6 Cooling System Notes ...
Страница 102: ...TP 6137 5 03 90 Section 10 Generator and Engine Disassembly Reassembly Notes ...
Страница 104: ...TP 6137 5 03 92 Section 11 Wiring Diagrams 11 1 Wiring Diagram Schematic GM20645 B ...
Страница 105: ...TP 6137 5 03 93 Section 11 Wiring Diagrams 11 2 Wiring Diagram Point to Point GM20645 B ...
Страница 106: ...TP 6137 5 03 94 Section 11 Wiring Diagrams Notes ...
Страница 114: ......
Страница 115: ......