TP-6137 5/03
73
Section 10 Generator and Engine Disassembly/Reassembly
Main Bearing Cover
1. Put the engine crankcase on the work bench so
that the flywheel side is in the upper position.
2. Remove the four main bearing cover nuts and
washers.
3. Install two screws (M6 x 30) in the threaded holes of
the cover and turn them until the cover is released
from the crankcase. See Figure 10-54.
4. Remove the key, O-ring, two angle rings, and two
elastic
washers.
See
Figure 10-55
and
Figure 10-56.
Figure 10-54
Main Bearing Cover
Figure 10-55
Main Bearing
Figure 10-56
Main Bearing
Crankshaft
1. Carefully
remove
the
crankshaft
from
the
crankcase.
Note:
Avoid touching/scratching the main bearing
bushing.
2. Use a puller to release the gear wheel from the
crankshaft. See Figure 10-57.
Figure 10-57
Crankshaft
3. For ball bearing replacement:
Содержание 3.5EFOZ
Страница 1: ...Marine Generator Sets Includes Engine Maintenance Models 4EOZ 3 5EFOZ TP 6137 5 03 Service ...
Страница 10: ...TP 6137 5 03 VI Safety Precautions and Instructions Notes ...
Страница 12: ...TP 6137 5 03 ii Service Assistance Notes ...
Страница 28: ...TP 6137 5 03 16 Section 3 Scheduled Maintenance Notes ...
Страница 42: ...TP 6137 5 03 30 Section 5 Fuel System Notes ...
Страница 48: ...TP 6137 5 03 36 Section 6 Cooling System Notes ...
Страница 102: ...TP 6137 5 03 90 Section 10 Generator and Engine Disassembly Reassembly Notes ...
Страница 104: ...TP 6137 5 03 92 Section 11 Wiring Diagrams 11 1 Wiring Diagram Schematic GM20645 B ...
Страница 105: ...TP 6137 5 03 93 Section 11 Wiring Diagrams 11 2 Wiring Diagram Point to Point GM20645 B ...
Страница 106: ...TP 6137 5 03 94 Section 11 Wiring Diagrams Notes ...
Страница 114: ......
Страница 115: ......