Chapter 3 installation method
MDC-5000 Series
3-30
0092653004-00
Operating unit
M4 screw
(four places)
Corner guard cap
(four places)
Note) Panel thickness: 10 mm (max)
3.3.2.1 Flush mounting for Operation unit
Preparation:
(1)
Cut an opening as shown in Figure 3.9 in desired location on a panel.
(2)
Mark position of mounting holes.
(4mm screw for 4holes)
(1
5
/3
2
)
12
(5
3
/6
4
)
128
(4
5
/6
4
)
122
(15/32)
12
(12 33/64)
318
(15/32)
12
(13 15/32)
342
(3
5
5
/6
4
)
98
(13 45/64)
348
Unit : mm(inch)
Installation:
(1) Remove corner guard caps of Operation unit.
(2) Insert the Operation unit and its connecting cable into the opening and adjust the Operation
unit parallel to the mounting face (Figure 3.10).
(3) Secure the Operation unit to the panel with 4 mm tapping screw (4 places).
(4) Reinstall corner guard caps removed in (1) to the original places.
Figure 3.9 Cutout Diagram for Operation unit
(4 51
/64
)
Figure 3.10 Flush mounting the Operation unit
Operation unit
Содержание MDC-5004
Страница 1: ......
Страница 2: ......
Страница 20: ...Chapter 3 installation method MDC 5000 Series 3 2 0092653004 00 RB808 RB809 Unit mm inch ...
Страница 88: ... This page intentionally left blank ...
Страница 114: ... This page intentionally left blank ...
Страница 130: ... This page intentionally left blank ...
Страница 150: ... This page intentionally left blank ...
Страница 151: ...0092653004 00 A 1 INTER CONNECTION DIAGRAM RB806 ...
Страница 152: ...A 2 0092653004 00 INTER CONNECTION DIAGRAM RB807 ...
Страница 153: ...0092653004 00 A 3 INTER CONNECTION DIAGRAM RB808 ...
Страница 154: ...A 4 0092653004 00 INTER CONNECTION DIAGRAM RB809 ...
Страница 155: ...0092653004 00 A 5 INTER CONNECTION DIAGRAM MRM 110 MRO 110 ...
Страница 156: ......