51
Installation & Operation Manual
7
Gas connections
(continued)
Use two wrenches when tightening gas
piping at boiler (FIG. 7-2), using one
wrench to prevent the boiler gas line
connection from turning. Failure to
support the boiler gas connection pipe to
prevent it from turning could damage gas
line components.
DIR #2000543316 00
USE BACKUP WRENCH
TO PREVENT PIPE FROM
ROTATING
Figure 7-2 Inlet Pipe with Backup Wrench
Natural gas:
Pipe sizing for natural gas
1. Refer to Table 7A for pipe length and diameter. Based on
rated boiler input (divide by 1,000 to obtain cubic feet per
hour).
a. Table 7A is only for natural gas with specific gravity
0.60 inches, with a pressure drop through the gas
piping of 0.3 inches w.c.
b. For additional gas pipe sizing information, refer to
ANSI Z223.1 (or B149.1 for Canadian installations).
Natural gas supply pressure requirements
1. Pressure required at the gas valve inlet pressure port:
• Maximum 14 inches w.c. with no flow (lockup) or
with boiler on.
• Minimum 4 inches w.c. with gas flowing (verify during
boiler startup).
2. Install 100% lockup gas pressure regulator in supply line if
inlet pressure can exceed 14 inches w.c. at any time. Adjust
lockup regulator for 14 inches w.c. maximum.
Pipe sizing for propane gas
1. Contact gas supplier to size pipes, tanks, and 100% lockup
gas pressure regulator.
Propane Supply Pressure Requirements
1. Adjust propane supply regulator provided by the gas
supplier for 14 inches w.c. maximum pressure.
2. Pressure required at gas valve inlet pressure port:
• Maximum 14 inches w.c. with no flow (lockup) or with
boiler on.
• Minimum 8 inches w.c. with gas flowing (verify during
boiler startup).
Maximum inlet gas pressure must not
exceed the value specified. Minimum
value listed is for the purposes of input
adjustment.
WARNING
WARNING
NOTICE
WARNING
Ensure that the high gas pressure regulator
is at least 6 - 10 feet upstream of the
appliance.
Knight Wall Hung Fire Tube boilers
are typically shipped ready to fire on
natural gas. Check boiler rating plate to
determine which fuel the boiler is set for.
If set to natural gas, it may be converted
to LP by installing an LP venturi and any
additional components provided in the LP
conversion kit (Models WH56 - WH286
only) or by installing a propane orifice
(Model WH400 only) (see pages 12 and
13). In order to operate on LP gas, these
components MUST BE installed. Failure
to comply could result in severe personal
injury, death, or substantial property
damage.
Propane Gas:
Содержание WH- 286
Страница 66: ...66 Installation Operation Manual 10 Start up Figure 10 2 Operating Instructions_ Models WH56 WH286 ...
Страница 67: ...67 Installation Operation Manual 10 Start up continued Figure 10 3 Operating Instructions_Model WH400 ...
Страница 86: ...Installation Operation Manual 86 Notes ...
Страница 87: ...Installation Operation Manual 87 Notes ...