Installation & Operation Manual
42
6
Hydronic piping
DIR #2000543519 00
ZONE 1
INDIRECT
DHW TANK
DOMESTIC
HOT WATER
CIRCULATOR
BACKFLOW
PREVENTER
PRESSURE
REDUCING VALVE
PRESSURE
GAUGE
ANTI-SCALD
MIXING VALVE
COLD
WATER
IN
AIR SEPARATOR
EXPANSION
TANK
BALL VALVE
(TYPICAL)
DRAIN POINT
(TYPICAL)
MAKE UP WATER
HOT
WATER
OUT
ZONE CIRCULATORS
(TYPICAL)
FLOW CHECK
VALVE
(TYPICAL)
BOILER
CIRCULATOR
SYSTEM SUPPLY
SENSOR
Y-STRAINER
(TYPICAL)
MAY SUBSTITUTE LOW LOSS HEADER
NOT TO EXCEED 4 PIPE DIA OR MAX. OF 12" APART
VALVE
ZONE 2
ZONE 3
ZONE 4
TEMPERATURE /
PRESSURE
GAUGE
UNION
(TYPICAL)
PRESSURE
RELIEF VALVE
DRAIN
UP WA
W
WATER
METER
Figure 6-6 Single Boiler - Single Temperature Zoned with Circulators - DHW Priority
Please note that these illustrations are meant to show system piping concept only, the installer is responsible
for all equipment and detailing required by local codes.
NOTICE
Содержание WH- 286
Страница 66: ...66 Installation Operation Manual 10 Start up Figure 10 2 Operating Instructions_ Models WH56 WH286 ...
Страница 67: ...67 Installation Operation Manual 10 Start up continued Figure 10 3 Operating Instructions_Model WH400 ...
Страница 86: ...Installation Operation Manual 86 Notes ...
Страница 87: ...Installation Operation Manual 87 Notes ...