Installation 15
AZURA® Conductivity Monitor CM 2.1S Instructions, V6710
Process
Figure
4.
Connect the plug of the elec-
trode to the socket
4
on the
front side of the monitor.
Integrate the pH monitor into the FPLC/HPLC flow path by installing it
down stream of the conductivity monitor. You can do this by mounting
the pH monitor onto the AZURA® Organizer, which is placed on the
AZURA® Click (both sold separately) at the side of the system. For more
information see supplement “
“.
Note:
Make sure that the maximum backpressure of 5 bar is not
exceeded in this configuration.
4.3.2 Connecting pH monitor to capillaries
The pH monitor has been mounted to the monitor.
Connect the capillaries in the direction of the flow. Use bushings and
fer rules with flat bottoms. Do not use any tools to tighten the bushings.
Legend:
1
Inlet
1
Outlet
Fig. 7:
Inlet und Outlet of the pH electrode
INLET: Connect the capillary coming from the conductivity monitor.
OUTLET: Connect the capillary which either go to waste, another
detector or the fraction collector.
Conduct the calibration of the pH electrode with 2 different pH calibrat-
ion buff er solutions (e. g. 4 and 7, see chapter „Calibrating the pH electro-
4
Next steps
Prerequisites
Prerequisites
Process
1
2
Next steps