![KLS Martin CEMOR Скачать руководство пользователя страница 49](http://html1.mh-extra.com/html/kls-martin/cemor/cemor_mounting-instructions_1978993049.webp)
CEMOR Monitor Suspension System
Revision 1
49
Make sure the 2D VESA mount
is safely in place:
•
The 2D VESA mount
must butt against the TFT screen.
•
The 4 cylinder screws must be of appropriate length and tightened according to the
instructions by the manufacturer of the TFT screen.
12.5
Aligning and Securing the TFT Screens
•
Align all TFT screens, see
recommendations in section 10
“Mounting Recommendations for VESA
Brackets”, page 39.
•
Press 1 locking rivet each into the
locking discs on the 2 ends of each
mounting rail
.
The 2 locking rivets protect the
TFT screens from falling off sidewards.
Make sure the locking rivets are safely in
place:
•
The locking rivets must be securely
pressed into the locking discs .
Fig. 12-5:
Aligning and securing the TFT screens
•
For each 2D VESA mount
tighten 2 slide rails using the 3 hexagon screws
M8 x 60 mm ISO 4017.
The 2 slide rails protect the TFT screens from falling off sidewards.
Make sure the 2D VESA mount
is safely in place on the mounting rail
:
•
The 2D VESA mount
must be screwed against the mounting rail
using the
2 slide rails .
Содержание CEMOR
Страница 73: ...Mounting Instructions 0BCEMOR Monitor Suspension System Revision 1 73 19 1 2 CEMOR 6...
Страница 74: ...Mounting Instructions 0BCEMOR Monitor Suspension System 74 Revision 1 19 1 3 CEMOR 8...
Страница 75: ...Mounting Instructions 0BCEMOR Monitor Suspension System Revision 1 75 19 1 4 CEMOR LS...
Страница 76: ...Mounting Instructions 0BCEMOR Monitor Suspension System 76 Revision 1 19 1 5 CEMOR on the Suspension Arm System...
Страница 83: ...Mounting Instructions 0BCEMOR Monitor Suspension System Revision 1 83...