WOOD BURNING BOILER COOKER ALTEA 110 SICURO TOP
23
EN - Rev. 1.2
INITIAL START-UP
Filling the boiler unit and the system for the first time
After connecting the appliance to the water system, fill the boiler unit as follows:
-
Dilute the
Long Life
product to 2% by pouring the contents of the bottle directly into the boiler unit
(See section
“Maintenance of the boiler unit”
)
;
-
Open the "
Boiler unit loading cock"
to fill the entire boiler unit until the water reaches the level of the "
Boiling
discharge pipe".
N.B.: the water level inside the boiler unit should cover the exchangers (primary and/or secondary).
Regularly check that the water in the boiler unit is at the level of the "
boiling discharge pipe
" at 80 ° c. top up as
necessary.
The appliance is fitted with a water level sensor which signals when there is insufficient water in the boiler unit. If the
level is too low, the "
Level switch - L4
" LED will light up on the display
(see section “
Electronic control unit”)
. If this
happens, fill to the appropriate level by opening the "
boiling unit loading cock
" and fill the boiler unit until the water level
reaches the "
boiling discharge pipe
".
To inspect the interior of the boiler unit, remove the upper cover, placing both lock hooks to position A (Open):
After filling the boiler unit, fill the system as follows:
-
Check the seal of all piping, the expansion vessel, and the circulation pump;
-
Open the “automatic air release valve” on the appliance;
-
Open the
“and system load cock”
to fill the system. Gradually allow the air to come out from the appliance through
the
“automatic air release valve”
;
optimum working pressure is 1.5 bar (when the appliance is operating);
-
Vent all radiators and any other de-aeration systems to ensure that there are no air bubbles in the system.
After installation, check the seal of all plumbing joints for the first few days of operation.
The system and the water inside the boiler unit can be emptied by opening the
“boiler unit drain cock”
situated at the
back of the appliance.
In a system subject to being emptied frequently, it is essential that filling is performed with water suitably treated to
remove hardness which can give rise to scaling.
Cover lock hooks.
Содержание ALTEA 110
Страница 1: ...ENGLISH Wood burning boiler cooker ALTEA 110 SICURO TOP INSTALLATION USE MAINTENANCE AND HELPFUL TIPS ...
Страница 2: ......
Страница 11: ...WOOD BURNING BOILER COOKER ALTEA 110 SICURO TOP 8 EN Rev 1 2 Overall dimensions ...
Страница 39: ...WOOD BURNING BOILER COOKER ALTEA 110 SICURO TOP 36 EN Rev 1 2 ...
Страница 40: ...Cod CS IST ALT110TOP EN KLOVER Srl Via A Volta 8 37047 San Bonifacio VR VAT No 02324280235 www klover it ...