background image

6

Pump group

The CERTO is supplied via a high-pressure pump that functions using a belt-driven electric motor.

It is a robust high-pressure pump with ceramic pistons, a drive housing made of die-cast aluminium, a crankshaft with a 

ball bearing and an oil sight glass. Water-lubricated pumps can also be used. The pump head is chemically nickel-plat-

ed, meaning it can also be used with deionised water. The pump with the drive motor and all safety installations is referred 

to as a pump assembly.

On the low-pressure side the water enters the filter unit 
with a 100 micron screen of the pump. The filter unit pro-
tects the pump and the nozzles against damage and ob-
struction.

The pump unit is equipped with a solenoid valve and a 
pressure control device on the low-pressure side. The 
solenoid valve stops the water supply when the unit is 
switched off.

The pump can only work properly with sufficient water 
supply pressure of 2 bar (30 psi) since it is not selfpriming. 
This water pressure is checked by the pressure control 
device. In case of a water supply pressure of 2 bars the 
pressure control device releases the pump for operation. 
If the water pressure falls below 1.6 bars (24 psi) the drive 
motor of the pump is switched off. By return off the mini-
mum pressure, the pump is switched on. By operation of 
more then one humidifier with one reverse osmosis equip-
ment, every pump must have a pressure of more than 2 
bar (30 psi).

The water leaves the pump on the pressure side and is 
sprayed through the nozzles of the humidifier. The water 
pressure is indicated by a pressure gauge. For the pro-
tection of the pump a pressure switch is installed on the 
pressure side. If the admissible pump pressure is exceed-
ed, the pressure switch device gives a signal to the control 
unit to reduce the speed of the pump and an error mes-
sage is given.

Before leaving the factory the pump is operated with the
appendant Klingenburg humidifier in order to check it for

Û

Function of the Pump station

Û

Water quality

CERTO humidifiers ar operated with reverse-osmosis 
deionised water.
 
The eletrical conductivity for the humidifier water can not 
exceed the value of  5-20 µS/cm. Max. Hardness degree 
1°dH.(german hardness). at 20°C.
PH - Wert: 7 +/- 1.

The particle freedom of the water is up to the operator.

The volume flow from the water treatment plant to your 
pump station should be greater than the maximum ca-
pacity of the humidification system.

To add water to your pumping station, you can choose 
between a 1/2 “threaded female thread and a supplied 
13mm hose connector.

The standard version includes a 3m supply hose (1/2 
“DN13) with DVGW approval. Optionally, other hose 
lengths can be enclosed.

Water- 

supply

Solenoid

valve

Check 

valve

Filter

Solenoid

valve

Pressure 

sensor 

 D1

Pressure 

sensor 

D2

Pump

PS

PS

M

Solenoid

valve

Nozzle 

System

Nozzle 

System

Содержание CERTO

Страница 1: ...enburg Humidifier Version 01 21 Air is our element energy recovery our passion Specification and general information Version with control range extension and aerosol separator made of stainless steel...

Страница 2: ...s 15 Test certificates 19 Planning information 21 Cleaning disinfection 22 Maintenance and operation 27 Terminal assignments controller pump station 30 Menu structure overview controller 31 Operating...

Страница 3: ...es the latest frequency converter technology Klingenburg CERTO Air Humidifier Reliable performance figures Adaptable to customer dimensions Available as a complete unit or a modular installation Ideal...

Страница 4: ...cription For the complete system version the stainless steel bottom pan includes a double sided gradient 6 This ensures the complete drainage of the residual water The use of fully deionised water per...

Страница 5: ...t pressure 140 bar Dimensions Pump station W 500 H 650 D 540 Weight Pump station 65 kg 69 kg 73 kg 76 kg 82 kg Feed water quality Deionised water with conductive value 5 20 microsiemens cm water hardn...

Страница 6: ...e then one humidifier with one reverse osmosis equip ment every pump must have a pressure of more than 2 bar 30 psi The water leaves the pump on the pressure side and is sprayed through the nozzles of...

Страница 7: ...the pressures in the system Low pressure switch as dry running protection for pump high pressure switch for limiting maximum allowed op erational pressure The electrical connections are joined in a te...

Страница 8: ...2200 CERTO FU 4 0 CERTO FU 5 5 Control unit Controller built into control cabinet Suitable for seamless humidity adjustment humidity control Externally accessible and readable control panel display C...

Страница 9: ...out Complete water evacuation from piping by the use of compressed air available as option Software updates allow retrofitting of subsequent func tional enhancements Inputs Enabling potential free con...

Страница 10: ...t be informed by the operator about possible dangers 10 Assembly Commissioning Installation Caution The maximum input pressure of the pump assembly must not exceed 5 bar Operating at any higher a pres...

Страница 11: ...10 V 4 20 mA The control signals should be connected to terminals 8 and 9 Terminal 9 is reference potential mass Motor connection Control signal connection Jumper setting The CERTO controller lets you...

Страница 12: ...on fittings on the humidifier or the pump station should be checked The check should be performed using two wrenches for counterholding The internal screw connections of the pump station are factory t...

Страница 13: ...is operated in manual operation up to the frequency limit specified on the pump data sheet and the actual and set point pressures are compared A deviation of 10 is permissible 11 To check the low pre...

Страница 14: ...he Control section In addition the control of the sys tem must be designed to meet the requirements of VDI 6022 Water supply The feed water must at least meet the microbiologi cal requirements of the...

Страница 15: ...d daher das Recht verliehen das nachstehend abgedruckte Pr fzeichen in Zusammenhang mit dem o g Produkt zu f hren T V NORD Systems GmbH Co KG Pr fstelle f r K lte Klima und L ftungstechnik Dipl Ing Mo...

Страница 16: ...euchtungssystem CERTO Klingenburg International Sp z o o Niederlassung Deutschland Gahlener Str 250 46282 Dorsten Pr fung vor Ort 16 02 2022 Dokumentenpr fung bis einschlie lich 25 02 2022 Ausstelldat...

Страница 17: ...ke Systems PR FSTELLE F R K LTE KLIMA UND L FTUNGSTECHNIK Gesch Nr KKL 1005 20 Essen 5 April 2022 Auftrags Nr 81 19 33 75 82 DoKl GrV Bericht Nr TR KKL 2022 013 Erg nzungspr fung an einem Luftbefeucht...

Страница 18: ...18 Test certificate...

Страница 19: ...A list of spare wear parts can be found on page 21 The room temperature during operation of the pump station and the controller should be between 5 and 35 C The CERTO humidifier is not frost proof and...

Страница 20: ...d cleaner For easily water soluble deposits Warm water 40 60 You may use a high pressure cleaner Do not aim the water jet directly at the seals and lighting Desinfection After the preliminary cleaning...

Страница 21: ...our if they are not sufficiently rinsed away It is important to ensure that following the maintenance operations all traces of the cleaning agents are eliminated from the humidifier Cleaning of the dr...

Страница 22: ...lt High pressure switch 135 150 bar Low pressure switch 1 6 2 bar Magnetic valve NP HP Low pressure manometer High pressure manometer Seal set nozzle holder Seal for high pressure nozzle High pressure...

Страница 23: ...rding to the local waste regulations Note for enhanced operational reliability e g for production plants To further enhance the operational reliability of the CERTO we recommend replacing the followin...

Страница 24: ...ensure that hose lines are replaced at appropriate intervals The maximum service life as well as the maximum use of a high pressure hose can be found in DIN 20066 Drive belts Checking of the drive uni...

Страница 25: ...and equipment as well as the machine The installation initial operation and maintenance of this drive may only be performed by expert staff that are well versed in the functionality and equipment as...

Страница 26: ...constantly on Control commands and operating signals such as start stop must only be implemented via the control terminals or the control panel and not by switching the mains supply or a motor contact...

Страница 27: ...ontroller X2 to controller a L Power supply valve output nominal 230V b Solenoid valve supply c Control range extension 2nd level d Control range extension 3rd level e 3 2 multi way valve for switchov...

Страница 28: ...Z 2 Solenoid valve 2nd level to controller a L Power supply valve output nominal 230V b Solenoid valve supply c Control range extension 2nd level d Control range extension 3rd level e 3 2 multi way va...

Страница 29: ...alve purge MZ 2 Solenoid valve 2nd level a L Power supply valve output nominal 230V b Solenoid valve supply c Control range extension 2nd level d Control range extension 3rd level e 3 2 multi way valv...

Страница 30: ...tart point P Value I Value Operating Mode Manual mode Humidity control External drive Rinse interval Rinse type Drying Rinse duration Air pressure rinse Normal rinse Drying time P0 Level point for 2nd...

Страница 31: ...own V K B 5 0 0 D E F N L B e f e u c h t e r A u t o s t a r t A c h t u n g R I s t f r e q x x H z M o t o r S t o p If the autostart function is enabled the following message appears If you access...

Страница 32: ...the right button This sets the clock that controls the error log Pressing again will open the menu item Manual draining S e r v i c e S t d M i T T M M J J 1 2 3 9 1 7 0 6 1 1 Manual rinsing M a n S...

Страница 33: ...v e O p e r a t i n g m o d e M a n u a l O p e r a t i o n O p e r a t i n g m o d e M o i s t u r e c o n t r o l Manual operation If Manual operation has been selected a manual target value betwee...

Страница 34: ...the slower the control D e s i r e d h u m i t y 1 0 9 5 6 0 P g a i n 0 2 5 0 0 0 1 0 I n t e g r a t o r t i m e 0 1 1 5 0 s 0 0 1 0 Target value range Caution Only change this setting if 1 humidif...

Страница 35: ...in the setting values of Maximum frequency will take you to the menu item Fre quency limit If excessive humidity occurs or the water consumption is too high the frequency can be adjusted here It is i...

Страница 36: ...the conduit filter pump and nozzles with fresh water If oil free pressured air is available air rinse is preferable In this hygienic rinse there are 3 steps First the conduits are rinsed with fresh w...

Страница 37: ...1 1800s 180s Conduit rinse Filter rinse duration Blowout duration In the first phase the water conduit to the humidifier is rinsed with fresh water via forwards pressure through the pumping station s...

Страница 38: ...sing 3 steps can be switched If the second set of parameters is needed for a special configuration the control range extensions 2nd and 3rd levels can be determined separately for parameter set P0 Res...

Страница 39: ...l l f r e q u 0 0 H z S I s t f r e q 0 0 H z Target frequency Actual frequency Target frequency Actual frequency In manual operation Started up via the Start button Start in manual mode Humidity con...

Страница 40: ...appears in the display the control unit is externally disabled via terminals 11 and 12 That is to say the DDC has not enabled the control unit or the connection is faulty e g due to loose terminals e...

Страница 41: ...o higher pressure for the same amount of water Conduit pressure fault Actual frequency Target frequency Actual frequency Fault message after the set tripping time Overpressure message is displayed L e...

Страница 42: ...customer service of Klingenburg GmbH C o m m u n i c a t i o n s e r r o r I M o t 0 0 3 4 A R 1 3 5 8 0 6 0 6 1 1 r u h o u r s x x x x x h S e r v h o u x x x x x h Communication error Communicatio...

Страница 43: ...s the right selection key repeatedly The operation pause is a parameter item in the controller menu that allows to temporarily shut down the humidifier without switching off the power supply When this...

Страница 44: ...always be shielded for cable lengths over 50 m current limiters should be provided Please enquire Dimensions L 256 mm W 232 mm H 128 mm L 355 mm B 262 mm H 168 mm CERTO FU 750 CERTO FU 1500 Output 0...

Страница 45: ...ellerate time Rinse interval Normal rinse Rinse duration Here you can enter your set values 45 Operation instructions controller Air pressure rinse Conduit rinse duration Air pressure rinse Filter rin...

Страница 46: ...e constantly performed For this reason Klingenburg GmbH reserves the right to make such changes without prior notice Despite the careful creation of these instructions Klingenburg GmbH cannot be held...

Страница 47: ...ly of pump station with delivered 3m long low pressure hose high pressure connections between pump station output and supply water connections of the humidifier with 3m long high pressure hose wiring...

Страница 48: ...lt 8M 20 936 338 0798 belt 8M 20 976 humidifier 348 2265 high pressure hose 0 262 m 2 x 90 S Form 348 1435 high pressure hose 3 m straigh angled each additional meter Item No description nozzles 348 4...

Страница 49: ...witch checked ND HD Start point Humidity setpoint Min Frequency Max Frequency Power up time Power down time Rinse interval Staff on site Rinse duration P boosting Drying Level 2 on Level 2 off Level 3...

Страница 50: ...tube flushed Number of nozzle tubes Nozzle pipes flushed Contact Person __________________________________ Company Fon __________________________________ Conditioning address _________________________...

Страница 51: ...e every 2 years 2 2 way solenoid valve NC 230V 1 2 0 6 bar YES 2 2 way HP solenoid valve V2A 0 200 bar YES Low pressure gauge YES High pressure gauge YES Gasket set for nozzle block YES High pressure...

Страница 52: ...tional size 3000 Montageanleitung Mounting Instructions KLINGENBURG RRS Doku CERTO 0121 2te Stufe DGS sn englisch indd Air is our element energy recovery our passion Klingenburg International Sp z o o...

Отзывы: